FM-3-81 Maneuver Enhancement Brigade Download

Page 118 of 188

Appendix A A-18 FM 3-81 09 November 2021 Table A-3. Protection integration to MDMP (continued) Key Input Steps Protection Actions Protection Output Key Output Mission statement Initial commander’s intent, planning guidance, CCIRs, and EEFIs Updated IPB and running estimates Assumptions Step 3: COA Development Determine array of protection assets Integrate protection tasks into COA Determine initial scheme of protection Coordinate health support requirements Ensure that link architecture meets requirements and has been allocated from respective agents Recommend appropriate level of survivability effort for each COA based on the expected threat Determine alternate construction location, methods, means, materials, and timelines to give the commander options Determine real-property and real estate requirements Identify indicators and vulnerabilities Recommended updates to PPL Recommended updates to EEFIs Determine residual risk Develop initial OPSEC measure and countermeasures Initial scheme of protection COA statements and sketches Tentative task organization Broad concept of operations Revised planning guidance Updated assumptions Updated running estimates Revised planning guidance COA statements and sketches Updated assumptions Step 4: COA Analysis (War Game) Identify limitations and shortfalls of protection tasks for each COA Determine branches, sequels, decision points, unintended consequences, and second- and third-order effects Develop risk management and decision points for risk tolerance Develop MOE and MOP Initial DAL Refined EEFI Refined information collection plan Refine OPSEC measures and countermeasures Initial risk management and risk tolerance decision point matrix Refined scheme of protection Refined COAs Potential decision points War-game results Initial assessment measures Updated assumptions Updated running estimates Refined COAs Evaluation criteria War-game results Updated assumptions Step 5: COA Comparison Compare economy-of- force and risk reduction measures Refined protection priorities Refined PPL Refined EEFI Refined scheme of protection Evaluated COAs Recommended COAs Updated running estimates Updated assumptions