AR-710-1 Army Inventory Management Download
Page 96 of 205
b. A line item number (LIN) is a 6–digit alphanumeric number that identifies the generic nomenclature of specific types of equipment managed by LOGSA SB 700–20. There are 3 types of LINS: (1) A developmental line item number begins with a "Z" and is referred to as a "ZLIN" until the materiel reaches the production design phase and type classification action is complete. At that point a ZLIN is replaced by a standard LIN, sometimes referred to as an SLIN. (2) Standard LINs always begin with a letter other than "Z” or “O”. (3) The third type of LIN is a Common Table of Allowances (CTA) LIN. c. A chain-of-custody exists between the SSN, the LIN and the NSN: (1) The SSN links current and future expenditures to equipment groupings. (2) The LIN identifies equipment on unit authorization documents within the SSN groupings. (3) The NSN identifies specific equipment within LIN variants (as applicable). d. The SSN relates to a budget line within the Presidential Budget submission. SSNs may be used individually as a stand-alone budget entry. A single SSN may also be assigned as an aggregate of subordinate or related SSNs for fiscal programming and budgeting purposes. The SSN is the key data element in maintaining visibility of the funding- through-fielding of major items of materiel. e. Types of SSNs— (1) AAO SSNs apply to major items for which a procurement quantity may be computed based on maintenance float factors and on force structure documents (for example, Tables of Organization and Equipment (TOE) and Basis of Issue Plans (BOIPs)). (2) Non-AAO SSNs are assigned to items or programs that do not require AAO or Army Procurement Requirement (APR) computation. The first two positions of non-AAO SSNs are alphabetic. Non-AAO SSNs are used as a rollup of dollars for spares, repair parts and modifications, when the funding category of items is under $2 million. (3) Numeric SSNs are assigned to secondary items for which requirements and distribution data are required. The first position is numeric. The appropriate IMM and SSN (Major Roll Code) are listed in table 10–3. 10–3. Standard Study Number System The Standard Study Number System (SSNS) is maintained to support major items and systems, selected secondary items, missiles, and ammunition. The LIW has a SSNS query tool that generates multiple NSN/LIN/SSN based reports. The SSNS provides: a. Visibility of new DA PAM 708–3 (SB 700–20) LIN data (prior to AAO and SSN assignment) effective the first day of each month. b. Standard cross-reference data identifying end items that require mobilization planning. This is used to produce semiannual reports in May and November of each year. c. Life expectancy, maintenance, and replacement factors used to compute acquisition, depot maintenance and distribution requirements. Maintenance float and replacement factors are reviewed and updated annually in the SSNS in accordance with AR 750–1. d. Identification of components major item (CMI) and associated support items of equipment. The IMM will notify ASA (ALT) and LOGSA to update the SSNS with CMI and ASIOE information as required. The PM/IMM procuring the CMI will ensure that the assemblage LIN (generating item) is assigned against the applicable SSN. Details on the CMI and ASIOE data interchange process is in chapter 11. e. A major item-planning price is published in LIN sequence and is available in FEDLOG. This price is for depot MEL computations and not for new procurement price usage. f. HQDA uses SSNS data to develop the President’s Budget, to compute the AAO, and to compute the Army Procurement Objective (the intended procurement quantity). g. Data on assets, requirements, overhaul, modifications, and procurement for primary and generating items (CMI and end item/assemblages). The SSNS compiles and identifies this data for various studies and reports, such as the procurement data base and TAEDP. h. Summary data on requirements, assets, procurement, and distribution for items of equipment and ammunition. 10–4. Standard Study Number-Line Item Number Automated Management and Integrating System a. The SLAMIS system is designed to provide major item chain-of-custody data and management tools that support equipment lifecycle management. The SLAMIS system provides information for standard LINs and for developmental line items of equipment (ZLINs). The system compiles and maintains data from authoritative Army data sources to support studies, analyses, and reports. The system also provides common data for audit trail purposes. In addition, SLAMIS automates and facilitates the coordination of lifecycle management requirements. The SLAMIS system is hosted on-line at https://www.slamis.army.mil. DCS, G–8 is the system proponent. b. The SSN is used in a hierarchical structure to capture data relationships from funding through procurement and fielding. The relationships are SSN-to-SSN and SSN-to-LIN. The hierarchy is relevant to a specific Budget Estimate Submission (BES) or President’s Budget submission (PB). The BES/PB-relevant hierarchy is used to associate 82 AR 710–1 • 28 November 2016