AR-710-1 Army Inventory Management Download
Page 95 of 205
available. Using RCF assets as a sourcing solution requires coordination with AMC LMI, DCS, G–4 and potentially DCS, G–8 (when DCS, G–8 managed items are involved). 9–5. Operational readiness float a. Operational readiness float (ORF) are end-item strategic assets deployed to an installation to maintain established readiness levels or meet training availability requirements during peacetime per AR 750–1. b. Assets are maintained by TDA or MTOE maintenance activities with a field or sustainment maintenance mission. They are used to exchange with supported units when repairs cannot be accomplished within ACOM, ASCC, and DRU established guidelines. c. ORF assets can be locally authorized (DCS, G–4, installation senior commander) on a temporary basis until approval/disapproval is received from DCS, G–4, Maintenance Directorate via the representing ACOM, ASCC, and so forth. If deemed an item of DA interest it will then be added to the Materiel Master Data File as a DA ORF item. All ORF (DA or locally authorized) demand data will be maintained in SAMS–1E/IE and SAMS–2E or other DA authorized system. d. ACOMs, ASCCs, and DRUs will use ORF to enhance equipment readiness and may use ORF to fill deploying unit shortages when coordinated with the AMC LMI. Any remaining ORF will be reported to the LMI for redistribu- tion guidance. e. Upon the outbreak of war, ACOMs, ASCCs, and DRUs will use ORF to enhance equipment readiness and may fill shortages when coordinated with the AMC LMI. Deployed ACOMs, ASCCs, and DRUs will transfer all remaining ORF assets to the LMI designated support element at the earliest opportunity. f. ACOMs, ASCCs, and DRUs deploying units to support peacekeeping, humanitarian aid, or disaster relief efforts may coordinate with AMC for ORF support. In these cases, ACOMs, ASCCs, and DRUs may transfer ORF assets to AMC who will maintain and issue ORF assets in the area of operations. 9–6. Updating operational readiness float and repair cycle float maintenance factors a. Factors for ORF and RCF computation are based on the level of maintenance and are displayed at LIN level. They are developed as part of the ILS process per AR 700–127. b. Additions, deletions, or updates are based on changes to maintenance data or input provided to the LCMCs by ACOM, ASCC and DRU per AR 750–1. 9–7. Annual operational readiness float update a. The ORF Annual Demand Data Report for LINs is submitted by the ACOM, ASCC and DRUs to LOGSA for consolidation and calculation of ORF factors. These factors are sent annually by LOGSA, through the LCMC and AMC, to DCS, G–4 (DALO–MN) and DCS, G–3/5/7 (DAMO–CI) for approval. b. Approved factors are forwarded to AMC with an effective date indicating when the SSN file is updated with the factor inputs. Once updated, the Requirements Staff Officer will update AE2S database for AAO calculation. c. As stated in paragraph 9–5c, ORF assets can be locally authorized as designated in writing by the ORF approving authority. ORF managers will ensure coordination is accomplished with DCS, G–8 identifying locally ORF authorized items within 30 days. All ORF, DA authorized or locally ORF authorized demand data will be maintained in SAMS–E or other DA authorized system. d. ORF assets will only be issued when the priority designator on the work order is 01 through 06 and the estimated repair time exceeds the ACOM, ASCC, and DRU established time criteria. Chapter 10 Standard Study Number Process 10–1. Scope, Standard Study Number System This chapter applies to all PA funded materiel (for example, aircraft, missiles, tracked combat vehicles, and so forth) assigned a SSN. It also applies to non-standard end/major items, ammunition, and other non-PA funded materiel requiring an SSN. 10–2. Application a. The SSN is an 11 character alphanumeric identification number used to indicate a single item or group of items. The SSN links funding to fielded systems and is used to aggregate key procurement information for: (1) Army financial weapon system assessments. (2) Meeting Congressional reporting requirements. (3) Identifying weapon system and equipment requirements. (4) Depicting accurate item procurement information to meet PPBES and Congressional funding intent. 81 AR 710–1 • 28 November 2016