Page 94 of 205
Chapter 9 Major Item Floats and Factors 9–1. Float overview a. The two types of end item floats are operational readiness float (ORF) and repair cycle float (RCF). The basic authority for floats is AR 750–1. Wholesale/national level policies pertaining to RCF are in this regulation (AR 710–1). Policy and procedures for ORF in retail/field support activities and commercial activities are in AR 710–2. b. Whether an item will require RCF is determined during the material solution analysis phase of the integrated logistics support (ILS) process. The materiel developer makes this decision, which is finalized by the capability developer during testing of the maintenance and depot maintenance plan. 9–2. Repair cycle float policy a. RCF is a national asset consisting of an authorized quantity used by the LCMC to replace like items turned in by the owning unit for a planned depot repair program. RCF is used primarily for equipment on-hand transfers to maintain readiness availability and unit readiness. b. The materiel and capability developers select items for float support during the development and operational tests of equipment planned for depot maintenance. The DCS, G–4, DCS, G–8 and AMC RCF working group recommend initial RCF requirements based on equipment repair requirements and specified equipment operational availability metrics. The DCS, G–3/5/7 (DAMO–CI) approves all RCF requirement requests from DCS, G–4. The DCS, G–8 system synchronization officer (SSO) will maintain oversight for programming command authorization requirements supporting equipment AAOs and BOIP adjustments. RCF requirements will be determined for funding using the annual POM requirement validation process. DCS, G–3/5/7 reviews and approves the RCF candidates using the calculation table in AR 750–1.The DCS, G–3/5/7 will also maintain oversight for the Requirements Staff Officer records in AE2S for DCS, G–8 SSOs and DCS, G–4 functional to use for POM process builds. c. During planned depot maintenance repairs for end items, AMC item managers will utilize the RCF factors to make recommended changes to the authorized RCF quantities and submit those changes to DCS, G–4 for staffing and G–3/5/7 for approval using AE2S ORF module. Upon approval, the RCF factor quantity, will be acknowledged and maintained by LOGSA (AMXLS–M) in the SSN file. d. RCF requirements may change anytime during the sustainment life of an end item. Causes include doctrinal, policy, OPLAN, repair program and hardware changes. When an RCF factor change affects the plans or programs for the RCF end item’s calculation, the planning factor is updated in the SSN file. e. RCF distribution requirements are determined by DCS, G–3/5/7 (DAMO–FM) based on recommendations from AMC and DCS, G–4 and allocated to components by DCS, GDCS, 8 for DCS, G–8 managed LINs and distributed by ASC as the Lead Materiel Integrator responsible for equipment distributions to the UIC level of detail. After a unit is activated during peacetime, the availability of assets is determined and distribution plans are prepared. The DCS, G–3/ 5/7 provides UIC level of detail requirements for RCF to DCS, G–8, DCS, G–4 and AMC for allocation and distribution planning. When a new program is created, the program assets will be coded with OP code “F” and project code “RCF” in the LMP. 9–3. Management of repair cycle float When an RCF item is selected for integrated materiel management, the LCMC major item manager will— a. Notify the appropriate ACOM, ASCC, Reserve Component and DRU 45 days before the date an item is scheduled for depot overhaul that the item must be turned in. b. Furnish the following information to the ACOM, ASCC and DRU 30 days before the date the item is scheduled for depot overhaul— (1) The delivery point for end items to be turned in for depot overhaul. (2) Delivery condition of an end item, including required subcomponents and Basic Issue Items (BII). (3) Determine a method of delivery to the repair facility, requirements for drivers and crew, and the fund citation. (4) Determine details for the issuance of a replacement item from RCF assets. (5) Monthly reviews will be conducted with the managing LCMC to review RCF status. 9–4. Accountability of repair cycle float assets a. The AMC major item manager is accountable for RCF assets. Assign RCF assets O/P code “F” (per AR 725–50) and project code “RCF”. The DCS, G–4 will approve the use of assets designated as war reserves or decrement stock for RCF exchange. b. RCF stocks are end-item national/wholesale assets consisting of an authorized quantity of use by the LCMC to replace like items turned in by the owning unit for a planned depot repair program. (1) Assets completing depot repair where a RCF asset was issued to a unit to replace an item turned in for repair will be used to replenish the RCF inventory to support future requirements. (2) The LCMC may issue RCF assets to fill MTOE/modified TDA or ORF shortages when other assets are not 80 AR 710–1 • 28 November 2016