AR-710-1 Army Inventory Management Download
Page 93 of 205
e. OPROJs. (1) OPROJs, either additive or non-additive, will authorize nonrecurring equipment over and above the normal allowances in support of specific logistics or contingency plans. Detailed instructions on OPROJs are in chapter 6. (2) DCS, G–3/5/7 approves requirements, which are then listed in classified guidance. (3) Do not include non-additive OPROJs in gross requirements determination. (4) Do not issue assets reserved for OPROJs for peacetime use without DCS, G–4 approval. (5) Compute quantities to support OPROJs by adding the total quantities of an item in each additive OPROJ. f. Post D-day consumption. (1) Post D-day consumption equipment will replace combat losses or worn-out equipment for a specified period of time after war starts. Determine it in daily increments after D-day (1–15, 16–30, 31–60 days, and so on). (2) The post D-day consumption quantity is the total of the combat consumption and the mobilization training loss quantities, as follows: (a) The combat consumption quantity is determined by multiplying the IIQ by the combat consumption factor, times the war intensity factor, times the number of months. (b) The mobilization training losses are calculated for units that undergo mobilization training and for the length of the training period. Determine these by multiplying the IIQ by the mobilization training loss factor times the number of months. 8–12. Army Acquisition Objective computation policies a. The AAO will equal the total of the elements making up the gross requirements (para 8–11a). b. Base computations on the following: (1) Defense Planning Guidance (DPG) and the Army Plan. (2) SACS. (3) SSN Cross Reference File. (4) Approved OPROJs. (5) WRSA. 8–13. D-day to production day concept a. The deployment day to production day (D–P) quantity is not funded or procured during peacetime. In determining the D–P quantity, assume that no formal advertising or competitive procurement will exist. b. The state of readiness is the number of months from deployment day through the first month of deliveries from production. c. Four production rates will determine the number of months to reach maximum production: (1) Minimum sustaining rate. (2) 1–8–5 production rate. (3) 2–8–5 production rate. (4) Maximum production rate with current tooling. d. Base mobilization production schedules on a “warm”, “hot“, or “cold“ schedule that indicates the industrial production capability. e. Do not use D–P quantities in the AAO computation. Include these quantities as memo entries in the ASA (ALT) procurement worksheets. Table 8–1 Major item management topic to Army regulation cross-reference TOPIC REGULATION Basis of Issue Plan (BOIP) AR 71–32 Line Item Number (LIN) assignment DA PAM 708–3 (SB 700–20) Logistics Structure and Composition System (LOGSACS) AR 71–32 Structure and Manpower Allocation System (SAMAS) AR 71–32 Tables of Organization and Equipment (TOE) AR 71–32 The Army Authorization Documents System (TAADS) AR 71–32 Type Classification AR 700–142 79 AR 710–1 • 28 November 2016