AR-710-1 Army Inventory Management Download

Page 92 of 205

8–8. Basis-of-issue plan a. The PM and/or materiel developer prepares the basis-of-issue plan feeder data (BOIPFD) and associated man- power requirements criteria (MARC). Via LIW, the BOIPFD is sent to the U.S. Army Force Management Support Agency (USAFMSA), Fort Belvoir, VA (https://fmsweb.army.mil). This is done within 60 days of the assignment of the ZLIN for each new or improved item unless it meets BOIP exception criteria (AR 71–32, chapter 3). The BOIPFD is used in the development of the BOIP. b. The supporting TRADOC capabilities manager/developer will also review the BOIP and the MARC data. c. The BOIP is used to determine equipment requirements for new or improved major items. TRADOC prepares and maintains the BOIP master file. The DA BOIP manager is the USAFMSA Requirements Documentation Directorate. Data included in the BOIP reflect the following: (1) The type TOE that requires the new item. (2) The quantity of the new item. (3) The necessary associated equipment. (4) The equipment to be replaced and estimated availability date of the new item. (5) MARC direct productive annual maintenance man-hours. d. A BOIP file is created and maintained as long as it impacts on the force as reflected in SACS. e. Detailed instructions of the BOIPFD and the BOIP are in AR 71–32. 8–9. Updating and maintaining authorization and allowance documents Programmed changes to requirements and authorizations can be submitted during the winter command plan cycle. Changes approved by DCS, G–3/5/7 are entered in the force management systems from 1 February to 30 June. The SACS is updated in July. 8–10. Structure and Composition System a. Structure and Composition System (SACS) covers an 8–year period that includes current, budget years one and two, and five out-years of the POM. The SACS is the basis for the following: (1) Determining personnel and equipment requirements and authorizations for the programmed Army force structure. (2) Identifying and developing IIQs. (3) Computing major items requirements. (4) Developing data for distribution planning through the Total Army Equipment Distribution Program (TAEDP). b. The SACS includes the following: (1) SACS header (unit information). (2) Logistics SACS (LOGSACS) for equipment requirements. (3) Personnel SACS for personnel requirements. c. The outputs from the SACS are listed in unit or line item format and classified according to materiel content. Section III Gross requirements policies/Army acquisition objective 8–11. Gross requirements policies a. Elements of gross requirements. (1) IIQ with BOIP applied. (2) ORF and RCF (chap 9). (3) APS requirements and stocks. (4) OPROJs. (5) APS. (6) WRSA. b. Determine gross requirements by theater or claimant for elements listed above. Round fractional quantities to the nearest whole number. Round multiple-step calculations only when the data are recorded for a specific claimant. c. Base gross requirements on the size and shape of the Army force projected for the end of an eight year time frame (current, budget one and two, and five POM years). d. Initial issue quantity. (1) The IIQ contains the required initial allowances of each major item in the LOGSACS for each unit in the approved Army Force Program. (2) The required IIQs contain those quantities of equipment a claimant needs to perform its mission in the event of war. They will not include sustaining quantities. (3) The total of all claimants for a major item will equal the IIQ. 78 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.