AR-710-1 Army Inventory Management Download

Page 87 of 205

Table 7–4 Supply Chain Performance Metric’s Reported Annually—Continued Data Source Computed by OSD for each military component. Related Data Metric measure the success of supply chain cost cutting efforts and is intended to inform and lead to im- proved supply chain management decisions. Goal Monitor and reduce. Table 7–5 Time Standards (in days) for Retrograde of Unserviceable Depot Level Reparables to Source of Repair LCMC Customer response Shipping Total Processing 1. Major Items CONUS 15 25 15 55 OCONUS 15 25 45 85 2. Secondary Items CONUS See note 1 20 35 55 OCONUS Air See note 1 20 49 69 OCONUS Surface See note 1 20 90 110 Notes: 1 For non automatic return items (ARI), add 30 days to time standard for LCMC processing time. 2 Details of retrograde standards and segments are provided by LOGSA on the LIW MyRetrograde Web site. METRIC FORMULA Forecast Error: Shows the magnitude of error. Formula is (1- dollar-weighted signed absolute forecast error) x 100 percent. A lower accuracy value signifies a larger difference between forecasted demand and actual demand. Forecast Bias: Shows the direction of error. For- mula is dollar-weighted signed percent forecast error. A positive value indicates over-forecasting and a negative value indicates under-forecasting. Note: 1. n = total number of items in the forecast 2. c i = per item cost for item i 3. f i = forecast demand quantity for item i 4. a i = actual demand quantity for item i Figure 7–1. Details for Forecast Accuracy Computation 73 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.