AR-710-1 Army Inventory Management Download
Page 81 of 205
validated annually by DA. This review process ensures that APS recommendation meets OSD or DCS, Guidance. It also ensures that the APS stocks for the program are limited to combat essential items and provide only austere levels of support. The validated on-hand density of equipment in the supported force structure will become the database for requirements computation. b. WRSA stockpile replaces allied combat losses and combat consumption only. Items for initial issue quantity (IIQ) and float stockage are not authorized. c. Missiles and rockets are distributed to WRSA only after all U.S. requirements are filled. d. The U.S.-supported portion of WRSA requirements will be determined on the basis of validated structure and appropriate loss and consumption factors. The requirements are then adjusted by applying the ally’s assets, to include: additional assets provided by transfers from various military assistance programs; in-country production capability; co- production projects; programmed FMS; and programmed third-country assistance. If the actual allied asset cannot be determined, then the pipeline and stockage levels will be considered full. The stockage materiel requirements, adjusted by the above, constitute the U.S.-supported portion of WRSA. 6–22. Overview and guidance a. Activity Sets are prepositioned specifically to equip Army forces deploying OCONUS to conduct training and exercises, to include joint and bilateral training opportunities. The prepositioned equipment will be stored, maintained, and managed by HQ AMC and OTSG/USAMMA at operational readiness levels prior to unit deployment. Units will deploy with TAT equipment and will draw the Activity Set equipment from APS upon arrival in country. b. Activity Set equipment requirements are determined and requested by the ASCC and reviewed by DA, HQ AMC, and OTSG/USAMMA, DCS, G–3/5/7 (DAMO–SSW) validates and approves the Activity Set for induction into APS. Table 6–1 APS prepositioning authorization document management codes for use with APS unit set authorization documents MTOE non-standard SB 700–20 definition Remarks code P Authorized for prepositioning 600 T To accompany troops 602 Notes: 1 Does not apply to WRSS. Chapter 7 Supply Chain Metrics and Data Management 7–1. Performance requirements Supply performance metrics are used to evaluate the readiness, responsiveness and reliability of Army inventory management and the support provided to the Soldier. Tables 7–1 through 7–4 provide information on each metric that will be reported to DCS, G–4 and in turn to the Deputy Assistant Secretary of Defense (Supply Chain Integration). Table 7–5 contains details on AWCF DLR retrograde time standards and figure 7–1 provides AWCF inventory demand forecast accuracy formulas. See DODM 4140.01, volume 10 for detailed information on each metric (or other documentation referenced in “related data” below). Table 7–1 Supply Chain Performance Metric’s Reported Monthly Metric Metric Wholesales stock/supply availability Definition Percent of demands placed on the wholesale echelon of supply that is not backordered, excluding fu- ture materiel obligations. Data Source LMP Related Data Stock availability computation details are in CECOM developed LMP information paper. AMC will report stock availability by LCMC/commodity and Status of Resource and Training System (SORTS). LCMCs will provide narrative explanations for SORTS systems with SA below the DCS, Goal. OSD compiles supply availability for each DOD Component. See paragraph 4–8 Goal 90 percent NMCS first pass, 85 percent non- NMCS first pass. 67 AR 710–1 • 28 November 2016