AR-710-1 Army Inventory Management Download
Page 77 of 205
6–10. Unit deployments a. Units and task force slices of units deploying onto APS equipment will account for property book equipment using the current Accountable Property System of Record (APSR). Asset reporting is also required throughout the deployment phases. Property books for deployed units/task force slices of units must be maintained separately from any portion of unit or equipment remaining at home station so as to maintain accurate asset visibility of deployed units and their equipment. b. Owning units transfer MTOE materiel left at the deploying home station to a left behind equipment (LBE) property book officer (PBO) for control. If no LBE PBO is available at the installation, the ACOM/ASCC/DRU will designate and provide resources for a PBO team for the LBE. DA controls disposition instructions for LBE. c. When equipment or unit sets are loaned, DA retains ownership of the equipment. d. Receiving units will arrange for a DODAAC and derivative UIC (if applicable). e. Specific policy on DODAAC and UIC assignment will vary based on deployment guidance and if a full or partial standard requirement code is issued or loaned. Units deploying onto APS will seek specific guidance from their ACOM/ASCC/DRU. Section IV Army Prepositioned Stock Operational Projects 6–11. Concept and overview a. An OPROJ consists of equipment requirements above the authorizations contained in MTOE, TDA, Modified TDA, and Common Table of Allowances (CTA) documents. b. Items in an OPROJ are limited to the type, range, and minimum essential quantity required to accomplish the stated mission. c. ACOM/ASCC/DRU commanders determine materiel requirements that support DOD operations, plans, and contingencies and submit them to DA for approval and resourcing. These projects are also available to support civil relief, civil disturbances, disaster relief, humanitarian assistance, civil defense, or other DA-approved missions. d. OPROJ visibility is in LIW and Joint Medical Asset Repository. 6–12. Request and revision procedures a. The agency or organization requesting to establish or change an OPROJ will prepare a written request to initiate or change an OPROJ. The proposal will be sent though the agency/organizations’ higher headquarters to DCS, G–4 (DALO–OCR–PS) and HQ AMC. b. The request will include—— (1) An indication of whether the request supersedes or modifies an existing OPROJ. (2) The HQ AMC-assigned OPROJ number, when requesting a change to existing OPROJ. (3) A statement that the OPROJ requirement does not duplicate and cannot be provided from other approved authorization documents applicable to the requesting agency. (4) The purpose and scope of the OPROJ. (5) A specific approved OPLAN, CONPLAN or designation of the type of disaster or humanitarian assistance that the OPROJ is designed to support. (6) A timeline for delivery of OPROJ to the specific sites when required. (7) The recommended storage location(s). (8) The estimated cost with Cost Benefit Analysis (CBA), if required. (9) On-hand assets identified (if any) that will be used to reduce the procurement requirement of the OPROJ. 6–13. Roles and responsibilities a. DCS, G–3/5/7 (DAMO–SSW) will— (1) Approve or disapprove the initial change or revalidation request within 15 workdays from receipt of request. (2) Ensure OPROJs support current specified operations plans, missions, or contingencies and do not duplicate existing capabilities and authorizations. (3) Assign DA Army Resource Priority List ranking. b. DCS, G–4 (DALO–ORC–PS) will— (1) Within 15 workdays from receipt of HQ AMC’s completed technical review, staff the OPROJ request within DA for final approval of sourcing. (2) Coordinate the resourcing and fill of all approved OPROJs. c. DCS, G–8 (DAPR–FDO) will— (1) Ensure that the type of equipment is correct for the OPROJ for DCS, G–4 (DALO–SUE) managed items. (2) Review and distribute modernization equipment items in OPROJs. 63 AR 710–1 • 28 November 2016