AR-710-1 Army Inventory Management Download

Page 66 of 205

(16) Stock due-out, end of period (line 17) is based on the line 6 (due-out beginning of period) and a simulation of demands, returns, inventory receipts and washouts during the stratification period. c. The Current FY position is the stratification of requirements and assets applicable to the balance of the FY. For a 30 September stratification the CY section represents those requirements and assets applicable to the 12 months following the stratification cutoff. In a 31 December, a 31 March, or a 30 June stratification, CY represents the respective 9, 6, or 3–month period, remaining in the FY. The total demands projected for the period are included only as a “memo entry’ Demands for stratification purposes, which are entered in column 1 (requirements) of figure 5–1, are those projected from the beginning of the period to the date of the last buy in the period. For items that reach a buy position in the CY, the stock levels will be those applicable to the last procurement forecast to be initiated in the CY. Stratify items not expected to be in a buy position in the CY based on the stockage levels forecast to exist at the end of the CY. The stratification elements, in order of priority, are shown under the stratification elements column. These elements are as follows: (1) Assets, stratification date, same as b(1) above. (2) Assets, anticipated non-applicable. Same as b(2) above, except that recoverable unserviceable returns from date of last buy to the end of the year are recorded in column 6. These returns will not apply to the requirements elements shown in column 1. (3) Protectable war reserves, other protectable war reserves and below depot requirement and stock due-out. Same as b(3), b(4), b(5) and b(6) above. (4) Independent demands. The estimated demands forecast through the supply control process during the CY from the beginning of the period to the date of the last buy in the period (or end of the year for no-buy items). Under “memo-entry“, record the estimated demands during the full period from the stratification date to the end of the CY. (5) Dependent demands. The projected or programmed demands during the CY from the beginning of the period to the date of the last buy in the period. Under “memo entry“, record the estimated demands during the full period from the stratification date to the end of the CY. (6) Total demands are the sum of the independent and dependent demands. (7) Safety level. Same as b(8), above, but computed as of the last procurement forecast to be initiated during the CY (date of last buy), or the end of the year for items not in a buy position. (8) Repair cycle. Same as b(9), above, but based on the IHPT days as of the date of the last buy during the CY or the end of the year for items not in a buy position. (9) NSO. Same as b(10) above. (10) PLT. PLT. Same as b(11), above, but based on the net demand rate computed as of the date of the last buy during the CY or the end of the year for items not in a buy position. (11) ALT. Same as b(12), above, but computed as of the date of the last buy during the CY or end of the year for items not in a buy position. (12) The procurement cycle, or economic order quantity, is computed as of the date of the last buy. If there is no buy forecast, the system adjusts the entry based on a calculation of requirements and assets. (13) Total requirements/assets/deficit (see para b above). (14) Assets beyond CY. Reflects the assets (columns 2 through 8) over those stratified to elements of the CY requirements. d. The AY position stratification section represents requirements and assets applicable to the 12 months immediately following the current FY. The requirements for the AY represent independent and dependent demands projected for the period as well as levels and lead times. The total demands for the AY are included as memo entries. Demands for stratification purposes (to be entered in column 1requirements) are those projected from the beginning of the period to the date of the last buy in the period. For items that reach a buy position in the AY, the levels and lead times are those applicable to the last procurement forecasted to be initiated in that year. Stratify items not expected to be in a buy position in the AY on the basis of the levels and lead times forecasted to exist at the end of the AY. Stratification elements are as follows: (1) Assets, beginning AY. This entry reflects projected assets as of 30 September following the stratification cutoff date. It is based on a line item simulation of forecasted demands, returns, commitments, obligations, and deliveries during the CY. (2) Assets, non-recoverable. Same as b (2), above, except that column 6 of this line reflects the forecasted recoverable unserviceable returns from date of last buy in the apportionment year. (3) Lines C.3 through C.14-stratification elements. Stratification elements for the AY are comparable to those for the current year except that stock due out is simulated as of 30 September following the stratification cutoff date. Also, levels are computed as of the forecast date of the last buy during the AY or the end of the AY for items not forecasted to be in a buy position during the AY. For those items not forecasted to be in a buy position during the AY, but for which one or more buys are forecast during the CY, the procurement cycle requirement is the AY assets plus AY returns, less inapplicable assets and the AY requirements. For those items not forecast to be in a buy position during the AY or the CY, the AY procurement cycle requirement, if a positive quantity, reflects (a) minus (b), below. 52 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.