AR-710-1 Army Inventory Management Download

Page 65 of 205

(recoverable unserviceable returns). Limit use of washout engineering estimates to new items for which there is little or no depot repair experience and to older items with experience that cannot be used as a guide. If an item’s history shows no condemnation for a year or more, consider using a condemnation factor of zero instead of an engineering estimate. Consider these condemned assets potential DOD excess in stratification reports of on-hand inventories. The stratification repair cycle timeframe is based on the LMP in-house production time for the reparable item. 5–5. Central secondary item stratification for budget Stratification reports are used to develop and support apportionment requests, budget estimates, POMs, and program analysis resource reviews. Reference figure 5–1, the stratification elements show the dollar value of assets which should be on hand or on order as of the stratification date to sustain operations until replenishment can be made to meet requirements. It also shows assets on hand and on order available to meet these requirements. Columns rows 7, 8 and 17 are not printed on the opening position stratification, but are visible in the BY, AY and out-year reports. a. Column 1 shows the requirements which the assets in columns 2 through 8 are stratified against on each row of the stratification table. The sequence of asset application in figure 5–1 (in priority and to all residual deficits) is as follows: (1) Serviceable stock on hand (column 2). (2) Due in from other than procurement or repair (column 3). This column includes shipments in transit from customers and inventory due in for disassembly. (3) Unserviceable on hand, inducted (column 4). Include condition code M unserviceable stock on hand already inducted for repair (previously funded). Line 2, assets non-recoverable, are expected depot washouts (para 5–4). (4) Unserviceable on hand, not inducted (column 5). These assets include all unserviceable assets in condition code F not included in column 4. As in column 4, line 2 reflects expected repair washouts. (5) Recoverable unserviceable returns (column 6) with expected repair washouts in line 2. (6) Procurement on order under contract (column 7). (7) Procurement on-order commitment (not yet on contract, column 8). (8) Deficit (column 9). The deficit column represents the unfilled requirements left after assets (columns 2 through 8) are applied to column 1 requirements. b. The stratification elements (such as, lines), in order of requirements priority, are as follows: (1) Assets, beginning of period (line 1). This includes both on-hand and due-in assets on IMM accountable records as of the stratification date. (2) Assets, anticipated non-recoverable (line 2). See paragraph 5–4. (3) Protectable war reserves (line 3). That portion of the AWR requirement which is funded for purposes of asset application, procurement, and inventory management. (4) Other protectable war reserves (line 4). That additional portion of funded AWR requirements which is not prepositioned. The requirements set for this element are those which are funded for the purpose of asset publication, procurement, and inventory management. (5) Below depot requirement (line 5) is the sum of SSA requisitioning objective levels for the material. (6) Stock due-out (line 6) is the sum of customer order quantities that either cannot be filled (due to stock outs) or are future due requirements. (7) Independent and dependent demands for the stratification period are summarized on lines 7 and 8. (8) Safety level (line 9) is the safety stock requirement computed by the variable safety level model to allow the item to achieve stock availability targets. (9) Repair cycle (line 10) is the estimated net demands for the repair cycle. This covers the estimated returns during the period between the pick-ups of an unserviceable item on IMM records to its restoration to a ready-for-issue condition. The repair cycle timeframe is based on the IHPT days. (10) Numeric stockage objective (NSO, line 11) requirements for insurance (IMPC AA) and mission-essential (IMPC AE) items (para 2–12). (11) Production lead time (line 12) is the estimated net demand for AWCF items during the interval between the date of the award of an order or a contract and the first significant receipt from the vendor into the supply system. (12) Administrative lead time (line 13) is the estimated net demand for secondary items during the interval between initiation of procurement work directive and award of an order or contract. The ALT plus the PLT equals the LMP planned delivery time. (13) Procurement cycle (line 14) is the estimated net demand for secondary items during the interval between procurement actions. Weighing the cost to hold inventory in defense depots against the LCMC administrative cost to procure new stock, the procurement cycle is the most economical timeframe between the placements of new procure- ment orders. (14) Total RO (line 15) is the sum of lines 3 through 14 above and in figure 5–1. (15) Assets beyond the RO (line 16). The serviceable and unserviceable assets on hand, serviceable returns beyond the RO, and procurement due-in which exceeds the RO. 51 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.