AR-710-1 Army Inventory Management Download

Page 64 of 205

(b) Dispose of O/P code 9 assets that do not have identified requirements during annual reviews. Chapter 5 Financial Inventory Management 5–1. Scope This chapter explains the composition and use of the Army Materiel Category Structure Code for inventory procured by multiple funding sources. The section on LCMC Budget Stratification processing is focused on Army Working Capital Fund (AWCF) secondary item inventory. Procurement Appropriation (PA) funded principal items are the focus of financial inventory reporting processes in the final section of this chapter. 5–2. Materiel Category Structure Code a. The MATCAT is a five-position code assigned to each NSN. See appendix D for policy details and explanation for each digit of the code. The MATCAT is a DOD standard code governed by the DLIS and published in DOD 4100–39–M, volume 10, table 65. b. At the field/retail level, the MATCAT code indicates what funds are needed to requisition or locally procure an item. At the LCMC level, it is used for categorizing the inventory into groupings and subgroupings such as funding type, lifecycle stage, reparability and weapon system application. At the AMC and DA level, the MATCAT is a prerequisite for the aggregation and analysis of both logistics performance and financial data. c. See appendix D–2 for details on changing the ABA code (second position of the MATCAT code). 5–3. The stratification process a. The stratification process applies AWCF inventory assets to requirements by priority and time sequence, provid- ing simulation of future repair and procurement actions as the supply position changes. This information is used for budget input, retention determination and inventory management metrics. Other uses of budget stratification data include: (1) Analysis of policy guidance and effectiveness of supply operations at the material, weapon system, commodity and AMC echelons of supply. (2) Review of financial controls (including procurement and requisition programming, budgeting, and financial inventory status reporting). This is done by converting the requirement and asset comparison to the common denomina- tor of dollars in the stratification process. (3) Source of AWCF demand and procurement forecast information. The peacetime procurement commitment and obligation authority requirements come from, and are supported by, a line item simulation-of-buy stratification through the budget year (BY) plus 1 year. b. DODM 4140.01, volume 10 governs the structure and content of the budget stratification for the military services and the DLA. The DOD standard format is based on legacy requirements objective (RO) and retention levels not utilized in the LMP MRP (para 4–1). The basic budget stratification table format is at figure 5–1. Requirement elements are arrayed on the left-hand-side of each row of the table (prioritized from top to bottom for stock reservation or issue). Assets, the columns going across the table, are applied in order against the requirements elements (first row from left-to-right, second row from left-to-right). The stratification table is produced for four separate periods of time: the opening position, current year (CY), apportionment year (AY), BY and BY+1. Derivations on the basic table in figure 5–1 can be used to focus on particular supply areas such as repair, LOT buys and retention levels. c. The readiness and retention stratification is a line item requirement and asset comparison of the national/ wholesale supply system. The requirement elements are identical to those in the stratification for budget but are in a different priority sequence. For readiness measurement, only the on-hand requirements are displayed in the sequence to identify assets by intended use for uniform reporting. That is, no lead time requirements are evaluated for readiness measurement. d. For stratification purposes, the categories of materiel are aligned with the appropriation and budget projects which finance the purchase of the materiel (see MATCAT in appendix D). Provisioning items will be stratified separately. e. Prepare stratifications for 31 December, 31 March, 30 June, and 30 September. Semiannual inventory reports to DOD (in the Supply Systems Inventory Report (SSIR) format) will be based on the March and September final stratifications. Note. An ERP based solution replacement to legacy budget stratification processes may be used. Metrics, inventory reporting, and AWCF budget input specified in this regulation must be met by the ERP based replacement solution. 5–4. Special instructions on reparable items Budget stratification table Line 2, assets non-recoverable are forecasted for depot repair washouts by applying the final recovery rate. These are posted for column 4 (unserviceable on-hand), column 5 (on-hand not inducted) and column 6 50 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.