AR-710-1 Army Inventory Management Download
Page 61 of 205
time to meet a required delivery notice issue date (RDNID) for each customer order. Determine the RDNID based on customer location, sales order date, priority and RDD. Report stock availability for all sales orders and for NMCS sales orders. Assign first pass stock availability to sales orders released before the RDNID. Assign second pass stock availability to sales orders released after the RDNID but before the end of the period. The first pass goal for all orders is 85 percent and 90 percent for NMCS orders. (5) Return: Continue to improve the visibility of all global assets, with emphasis on the retrograde of unserviceable DLRs to the national/wholesale echelon source of repair depot or contractor. This will improve the LCMC IM’s repair planning and sourcing functions and reduce the LCMC’s new procurement requirement. Measure AWCF DLR retrograde times by geographical region and priority (table 7–2). Section IV Provisioning and Phase-Out Segments of the Item Lifecycle 4–9. Provisioning phase of the item lifecycle a. The source, maintenance and recoverability (SMR), essentiality and other codes assigned to a newly provisioned item, and recorded in the provisioning bill of materials, will determine how the new item is managed at the national/ wholesale echelon of supply. These decisions will in turn be reflected in the IMPC, SMC, MRP type and other codes that determine how requirements will be managed for the new item. The third position of the MATCAT code (table D–4) will be 4 for provisioning items, then change to 1 (reparable), 2 (consumable) or 3 (insurance item) when provisioning is complete (via a ZFLIS transaction in LMP). b. The provisioning parts list will be uploaded and processed into LMP via transaction ZMMLMI. Validation, FLIS screening, material check and create, bill of material check and create are all required for successful build of the LMP provisioning bill of materials. c. AR 700–18 outlines policies for determining initial stockage quantities and for the budgeting and funding of provisioning items (also see chap 5 and 6). d. Initial provisioning requirements will be computed using the AMSAA sparing-to-availability model Visual Selected Essential Item Stockage for Availability Method (Visual SESAME). LCMCs, with input from the LOGSA Expert ASL Team, will use demand data from early fielding locations to update provisioning requirements for follow- on locations/units. e. For DLA managed repair parts, SSRs generated by SESAME will be used for evaluating supply support and stockage alternatives. Army demands for these items will be procured upon receipt of a funded requisition to the appropriate DLA supply center. Requisitions must be received at least an acquisition lead time in advance. The SSRs for logistics data management actions only (for example, assignment of an NSN) will be processed by DLA. Details on the DOD standard SSR process are in DOD 4140.26–M, volume 6. f. The initial provisioning factor (IP–FAC) date is the start of the 24 month DDP. The LMP IP–FAC date is based on either the first unit equipped or the initial operating capability date for the supported component or end item. At the start of the DDP, the forecast is based on provisioning maintenance/replacement task distributions and failure factor estimates for the item (for example, an “engineered” demand rate). At the end of the DDP, the forecast will be based solely on demand history. g. The DDP can end prior to 24 months past the IP–FAC date if the LCMC determines demand history captured to- date will be representative of future demands. h. The IP–FAC date for ASIOE is the same as for the primary end item or weapon system unless DA sets an alternative date. i. For follow-on provisioning, LCMCs (with input from the LOGSA Expert ASL Team) will use demand and deadlining data from early fielding locations to update provisioning requirements for units that have yet to be fielded. j. Once the DDP has ended, the item will migrate from the provisioning to the replenishment/sustainment phase of the item lifecycle and use the requirements process outlined in paragraph 4–1. k. For individual DLRs, revalidate provisioning SMR coding when/if repair costs exceed 65 percent of replacement cost during the lifecycle of the item. See DODM 4140.01, volume 2 for more information on this secondary item maintenance expenditure limit (MEL) and the sourcing decisions that must be considered. l. Use SESAME to obtain requirements data for items with no available DDP or LOGSA Expert ASL team data. 4–10. Phase-out segment of the item lifecycle The LMP effective out date estimates when field/retail demands for a secondary item will stop. The economic retention model extends the date five years and then decrements ERS levels prior to the adjusted effective out date, eliminating the ERS level once the adjusted date is reached. As requirements diminish, LCMC item managers will focus on managing CRS and PRS levels while minimizing item dormancy (no activity at any one storage location for two or more years). 47 AR 710–1 • 28 November 2016