m. Web-based collaboration portals will be used to link Army supply and acquisition managers with their strategic vendors. The goal is to improve communication of Army requirements and vendor production planning. This will reduce the potential of the “bullwhip effect” and shorten the lead time for transmitting the Soldier’s demand signal through the supply chain to the sub-vendors that the strategic vendor relies upon. n. See paragraph 2–14 for LOT buy acquisition strategies. 4–8. Supply chain management The Supply Chain Operations Reference (SCOR) model breaks the supply chain into five activities: plan, source, make, deliver and return. a. In this simplified example, AMC executes the five SCOR model segments for DLR management as follows: (1) Plan: LMP uses historical demands, project systems (repair), promotions, provisioning, coverage profile (safety level) and other requirements to recommend procurement and repair forecasts to national/wholesale echelon item managers (IMs). (2) Source: The IM initiates new procurement, organic repair, commercial repair or other sourcing actions to obtain the required (serviceable) DLR. (3) Make: Industry, an organic depot or other sources of supply manufacture a new DLR or repair unserviceable DLRs. (4) Deliver: The serviceable DLRs pass through the Defense Distribution Depot system to Army Supply Support Activities (SSAs) where they are issued to Army units. (5) Return: Unserviceable DLRs are retrograded back to the national/wholesale echelon where the IM uses the SCOR model planning and sourcing functions to determine and execute the appropriate supply actions to repair and redistribute the DLRs. b. Each major link of the Army spare parts supply chain (industry, AMC and Army units) are continually executing their own plan, source, make, deliver and return activities, passing hardware, information and funding between each other. What one major link does, or does not do, will impact the other. For example, if demands from Army units double without advanced planning and sourcing notification (through the LCMC) to the manufacturer or repair depot, unit costs, lead times and backorders may increase. c. Use the following actions to improve SCOR model supply chain management (SCM) activities: (1) Plan: Use integrated business planning to coordinate demand forecasts at the item grouping level. Measure the success of this planning effort and daily operations via management metrics that gauge the accuracy of data elements, inventory levels and requirements used in the LMP demand and supply plans. Core supply management metrics are in chapter 7. Continue to reduce planned delivery and in-house production times through LCMC business process improvement. Completion and accuracy of the provisioning and repair bills of material will be measured due to their impact on the accuracy of LMP demand plans. Adjust repair and procurement orders as warranted by validated changes in requirements. Reschedule procurement deliveries in or out as recommended by the LMP and validated by the IM. Take prompt action to cancel all un-awarded procurement due-in that is excess to requirements. Use the procurement economic cutback model along with IM knowledge of programmatic, acquisition and logistics factors to determine the cost benefit of reducing or canceling awarded procurement due-in. Due to the LCMC administrative cost of procure- ment, do not reduce or cancel awarded procurement due-in valued at $5,000 or less (based on replacement price) unless there is no future requirement for the assets. LCMCs will utilize centralized review boards to monitor, track and report procurement on-order excess. (2) Source: Identify the LCMC’s strategic vendors based on the volume of goods and services provided. Manage these key vendors via supplier scorecards and develop collaborative partnerships with them. Emphasize and incentivize production delay time reductions with all new part manufacturers. Where appropriate, and as validated by BCAs, implement PBL alternatives to traditional SCM processes. Periodically revalidate the BCA to ensure the chosen PBL solution continues to be the best value for the Army. (3) Make: For all vendors (both procurement and repair), continue to reduce planned delivery and in-house production times. Via collaboration, reduce the time required to communicate changes in demands from Army units, passing through the national/wholesale echelon, to the manufacturer or repair depot. This will allow the manufacturer or repair depot to quickly adjust their internal SCOR model activities to meet the changing AMC demand. (4) Deliver: Position procurement receipts and repair output of AWCF items at DDDs in proportion to the percentage of past demands issued from each location. First destination procurement deliveries (locations and quantities for each) will be clearly stated in purchase requests. Avoid unnecessary second destination transportation costs by not stockpiling repaired DLRs at the source of repair location, unless justified. Use inventory and transportation tradeoff analysis (including economic movement quantities) to redistribute national/wholesale echelon AWCF inventory as required. Measure and continue to optimize the following supply and distribution metrics: (a) Logistics response time, the elapsed time (days) from requisition date to SSA receipt. This is a measure of combined SSA, LCMC, distribution and transportation effectiveness in meeting customer demands. (b) Stock availability measured monthly for each stocked item and rolled up to weapon system, LCMC and AMC aggregates. This is a measure of national/wholesale echelon LCMC, depot and distribution processing and transport 46 AR 710–1 • 28 November 2016