AR-710-1 Army Inventory Management Download

Page 58 of 205

acquisition objective, ERS and CRS levels as determined on an item-by-item basis. ERS quantities are displayed on the LMP budget stratification table and in the LMP operative report of excess. (1) Do not include condition code “H” and “P” assets in the stratification of PRS inventory. (2) National/wholesale echelon assets may be retained up to the sum of the approved acquisition objective, ERS, and CRS. (3) Screen AWCF PRS items for AWRS usage prior to disposal (para 2–20) (4) LCMCs will take a maximum of 3 months to complete the PRS analysis process plus one additional month to complete the approved IM decision (such as, dispose, transfer to CRS or make required database corrections). (5) On an item level basis, priority should be placed on the disposal of condition code “H” and “P” stock, dormant stock (para 2–5), older configurations and other unserviceable assets with no future need by the Army. (6) Disposal actions will follow the approval thresholds in table 4–1. At a minimum, one level of supervisory review is required for any LCMC disposal action regardless of dollar value. 4–5. Credit for assets returned to the national/wholesale echelon a. Army managed secondary items are sold at standard price (SP) which is based on procurement cost, inflation and the AWCF cost recovery rate (CRR). The CRR is updated annually for each LCMC and allows AMC to recoup the costs of secondary item management, inventory and transportation operations. b. Serviceable DLRs returned to the national echelon receive a credit equal to the SP less the CRR. c. Unserviceable DLRs returned to the national echelon receive a credit equal to the SP less the CRR and the loaded repair cost. d. The loaded repair cost is based on a formula which comprises average repair cost and washout costs for each class of repair (for example, organic depot, contract depot and below-depot). e. Non-Army DOD customers normally receive the same serviceable and unserviceable credit. 4–6. Global planning parameters Update the global parameters table in LMP annually in the 1Q of each FY. These parameters will be supplemented by annual AWCF budget and operational guidance from DCS, G–4 (in coordination with DCS, G–3/5/7) and by annual AWCF Resource Funding Guidance issued by the Army Budget Office, Business Resources (SAFM–BUO–R). Supply chain metrics and goals are listed in chapter 7. LCMC use of parameter values or data sources other than those below must be approved by DCS, G–4 (AMC) (AMCLG–SUS): a. Investment cost/discount rate—obtained from the 30–year Real Interest Rate on treasury notes and bonds as published by the U.S. Office of Management and Budget on appendix C of Circular A–94. b. Net disposal value—the return to the U.S. Treasury from DOD disposal sales after all administrative and operating costs are considered. This factor is used by the economic retention model. LCMCs should use a net disposal value of 1.8 percent. Future updates will be obtained from DLADS. c. Inventory loss rate—this is an estimate of storage pilferage and other inventory “shrinkage” costs. Use s percent determined locally by each LCMC, with assistance from AMSAA for each commodity. Current LCMC storage loss rates are in the 1 to 2 percent range. d. Obsolescence cost—an estimate of materiel that will become obsolete before the end of its lifecycle. This can be caused by technological improvements, over forecasting of requirements, and other variables. Excess resulting from sudden deceleration of war activities is excluded. AMSAA produces tables to estimate the obsolescence risk rate by each commodity considering the dollar value and age of the item. e. General storage cost—estimated total cost of annual DLA Distribution Services (DDS) receiving, issuing, and other physical inventory management operations. Use one percent for this parameter. Section III Acquisition Strategies and Supply Chain Management 4–7. Acquisition strategies a. AR 70–1 describes Army acquisition policy with a focus on Class VII materiel. This section provides supplemen- tal information with a focus on Class IX materiel. b. The designated PM is responsible for the lifecycle management (LCM) of DOD systems. This includes the planning, implementation, management and oversight of all acquisition, development, production, fielding, sustainment and disposal actions during the system’s lifecycle. Under LCM, the product support manager for sustainment activities supports the PM in the development and documentation of an acquisition strategy. This strategy will guide program execution from initiation through the re-procurement of systems, subsystems, components, spares and services through- out the lifecycle of the system. c. Weapon system acquisition strategies are determined early in the lifecycle, for example the decision to utilize contractor logistics support (CLS) vs. traditional national/wholesale echelon repair and procurement sources. The product support manager may modify acquisition strategies following reassessments during the system’s lifecycle. 44 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.