a. The ALT is the number of days between purchase request initiation by the item manager and contract award. Do not include other timeframes in the ALT. b. The PDT is the number of days between contract award and first significant contract delivery (generally 10 percent of total contract quantity). Do not include first article test deliveries in the PDT computation. c. Use the most recent representative procurement history to determine ALT and PDT. Expedited and urgent buys are examples of non-representative procurement history. d. Items without representative procurement history will use a static ALT or PDT based on the item manager’s and, or contracting specialist’s estimate. e. For provisioning items, use the logistic engineer’s estimated ALT and PDT (or 6 and 12 months respectively if not available). f. Items for which a LOT buy (para 2–14) has been made, items on indefinite delivery type contracts, and items "living off repair" (with no future planed procurements) will use an ALT of 1 month. g. LCMCs will use continuous process improvements to reduce ALT and PDT timeframes to the maximum extent possible. This will lower future coverage profile requirements (para 4–8). Lower lead-times have the added benefit of indirectly improving the likely accuracy of any demand/supply plan. h. Collaborate with the DLA to reduce production delay time on items procured outside of Army acquisition centers. i. Measure the variance between LMP data table and actual production delay time at the material level. Measure the accuracy of estimated ALT at the time of purchase request initiation against actual ALT at contract award. Measure the accuracy of PDT at contract award against actual PDT upon contract delivery (table 7–3). Section II Retention Management, Credit Policy and Supply Chain Metrics/Parameters 4–4. National/wholesale retention policy Stratify secondary item assets to the following categories: a. Approved acquisition objective: computed by the LMP budget stratification (computation is at para 5–5). b. Economic retention stock (ERS): the quantity of an item above the approved acquisition objective that is determined (by the AMSAA economic retention model) to be more economical to retain for future issues than to dispose and then potentially having to replace it via new procurement(s). ERS is categorized as demand-based retention stock. Individual secondary item ERS levels will be centrally updated by LCMC supply chain planning personnel on a quarterly basis prior to the quarterly MRP and budget stratification cycle. (1) Use the largest of available demand base years to forecast the demand rate used in the economic retention model to assign optimal retention of items for which demands prove a potential future need. (2) The ERS quantity will not exceed the maximum economic retention limit for each item. (3) ERS parameters are at paragraph 4–7. AMC senior management will review and provide written confirmation of ERS parameter validity to the DCS, G–4 on an annual basis. c. Contingency retention stock (CRS): the quantity of an item that exceeds the approved acquisition objective and the ERS requirement levels as displayed on LMP budget stratification tables. LCMC item managers are authorized to set CRS requirements on an item-by-item basis that will protect stock from stratifying to PRS levels. CRS levels will be set only for the authorized categories below. (1) The LCMC item manager will follow AMC policy and obtain table 4–1 approval levels in setting CRS levels. At a minimum, one level of supervisory review is required for setting new CRS levels regardless of dollar value. Retain documentation of approved CRS level for each material/item. (2) Authorized categories for CRS are reclamation, security assistance, humanitarian use, military necessity (at the NSN level), LOT buys (para 2–14) and weapon system-level exclusions. Use of the last category must be approved by the DCS, G–4 (AMC). (3) Consider item serviceability, shelf life, effective out date (formerly phase out date), physical storage limits and all other technical/programmatic considerations in assigning CRS levels on an item-by-item basis. (4) Assign a reason code to each item with CRS (following AMC policy) that can be aligned to one of the six reasons authorized by the Office of the Secretary of Defense (OSD): diminishing manufacturing sources, potential humanitarian relief, potential FMS, parts source/cannibalization, potential weapon system modification and other military essentialities. (5) Do not retain unserviceable assets for the potential humanitarian relief CRS reason code. (6) The maximum CRS usage period for items held for potential FMS usage is 2 years. Use of purpose code “N” to identify and “fence” potential FMS items is no longer authorized. (7) Delete, revalidate and obtain re-approval for CRS levels on all items annually. AMC senior management will review and provide written confirmation of CRS validation to the DCS, G–4 on an annual basis. For each LCMC, document this annual review via commander’s certification. d. Potential reutilization stock (PRS): on-hand, on-order and other due-in stock beyond the sum of the approved 43 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.