AR-710-1 Army Inventory Management Download

Page 56 of 205

Table 4–1 Approval levels for all supply actions—Continued Dollar level Approval level Over $100,000,001 Deputy Commander, HQ AMC. Notes: 1 Always plan for the reclamation of usable assets and the repair of unserviceable assets as the first source of supply before procuring new inventory (para 2–3). 2 All disposal actions require at least one level of documented LCMC management review and approval regardless of dollar value (para 3–28). 3 LCMC supply actions requiring review and approval are not limited to those originating from LMP MRP or budget stratification processing. 4 Previously approved procurement and repair actions that MRP recommends for Reschedule In do not require additional review and approval unless the original approved dollar value is exceeded by ten percent. 5 Making multiple lower dollar value supply actions in place of one larger value supply action (to avoid the higher required level of review and approval) is prohibited. 6 LCMCs may delegate budget stratification reviews above the 5 million dollar threshold to the division chief level as these are not executable supply ac- tions. 4–2. Demand planning, supply planning and data integrity Determining requirements for secondary items begins with initial provisioning (para 4–9), continues through the demand development period (DDP) and then through the life of the associated end item or weapon system. Require- ments will be based on clearly defined weapon system or end item readiness objectives, usually stated as a national/ wholesale echelon stock availability target (para 4–3). a. Use the latest independent demand history as a foundation for developing an independent demand forecast in LMP. The number of months used will vary based on weapon system and commodity based considerations including current and planned Army operations. (1) Demand and return history data will identify at least the following: (a) Originator. (b) Quantity. (c) Date received. (d) Type of transaction (for example, repair depot parts support demands). (2) The length of the base demand period may vary from the standard 12 months by command, weapon system, and individual item by exception. (3) Future demand may vary from past demands based on changes to program data (for example, operating tempo). LCMCs will update end item density data in the Major Item Planning Book quarterly before each budget stratification cycle. Thus, an updated program change factor (PCF) will be passed to the Secondary Item Demand Planning Book. The PCF is the ratio of future program data over a period up to the next 5 years divided by past program data and is used to increase or decrease demand history-based forecasts as applicable using the same base period in the PCF as in the demand forecast computation. b. Supply planning techniques will be tailored based on the SMC of the material (para 4–1) as well as the item stockage category (for example, stocked/non-stocked, active/inactive, essential/nonessential). Essential and mission critical (IMPCs AA and AE) items have a minimum stockage level of one (para 2–12). c. For demand planning of active/stocked items, AMSAA recommend use of either a 12 or 24 month moving average forecast or an exponential smoothing forecast (with alpha factors between .08 and .15). Use intensive item management processes to forecast requirements for high demand high dollar value DLRs due to the payback in inventory accuracy and enhanced customer support When demand data are not available, engineering estimates or demand data for similar items may be used. (1) Include planned program requirements (PPRs) not derived from demand history in the item-level DP. Examples of PPRs include SSRs, special program requirements from other AMC LCMCs or DOD activities, FMS, mobilization and depot repair requirements. (2) Forecast unserviceable returns separately from demands for reparable items (see app D–2 rationale for assign- ment of the consumable/reparable indicator based on the maintenance repair code and the ARIL code). d. LCMCs will perform continuous surveillance and correction of secondary item supply and demand planning data validity and accuracy. This includes, but is not limited to— (1) Provisioning bill of materials (PBOM)—for accurate PCF calculations. (2) Repair bill of materials—for accurate repair program parts requirements. (3) Stock transport order (STO), on-hand asset and stock due-out quantities. (4) Planned delivery and in-house production times. 4–3. Coverage profile and procurement/repair lead-times Planned delivery time is the sum of the administrative lead time (ALT) and the production delay time (PDT). 42 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.