AR-710-1 Army Inventory Management Download
Page 55 of 205
150 + 24 to 149 1 to 23 None SMC A1 MRP Type PD Period Lot SMC A2 MRP Type PD Period Lot SMC A3 MRP Type PD Lot -For -Lot SMC A4 MRP Type PD Lot-For -Lot SMC B1 MRP Type PD Period Lot SMC B2 MRP Type PD EOQ Lot SMC B3 MRP Type PD EOQ Lot SMC B4 MRP Type PD Lot -For -Lot SMC C1 MRP Type PD Period Lot SMC C2 MRP Type PD EOQ Lot SMC C3 MRP Type PD EOQ Lot SMC C4 MRP Type PD Lot -For -Lot SMC D1 MRP Type VB Static ROP SMC D2 MRP Type VB Static ROP SMC D3 MRP Type VB Static ROP SMC D4 MRP Type VB Static ROP UNIT PRICE DEMANDS a YEAR $10,000 + $ 100 to $2,499 < $99.99 $ 2,500 to $9,999 Figure 4–1. Inventory analysis matrix b. Table 4–1 lists the approval levels for all LCMC supply actions (for example, procurement, repair, reschedule, excess reviews, CRS initiations and modifications). The review thresholds will be based on the extended dollar value of the final supply action. For supply actions with multiple recommendations (for example, procurement, repair and, or disposal), staff the approval requests based on the single largest dollar value supply action. The approval will be for the combined supply actions. The supply action(s) should not be initiated prior to obtaining the appropriate level of approval. The thresholds in table 4–1 prevail over all other approval levels. See notes below table 4–1 for additional guidance. c. Provide for an automated capability to store and retrieve supply planning report formats. Data to be retained include demands, returns, assets, forecasts, key rates/variables and resultant supply actions. Include related item and other data necessary to successfully audit supply decisions at the individual material level. Retain the most current 6 years of demand/return data and 3 years of individual item supply action audit trail data throughout the lifecycle of secondary items. Table 4–1 Approval levels for all supply actions Dollar level Approval level Up to $500,000 Inventory manager (GS–12 or below, or equivalent). Over $500,001 to $1,000,000 Weapon system or product line manager/team leader/inventory manager. Coordination with the PM is re- quired. Over $1,000,001 to $2,500,000 Branch Chief may co-sign recommended actions that have been reviewed and approved by the senior supply person in the branch. Coordination with the PM is required. Over $2,500,001 to $5,000,000 Division chief. Coordination with the PM is required. Over $5,000,001 to $10,000,000 CG/commander of an LCMC. May delegate approval authority to director. Coordination with PM/PEO re- quired. Over $10,000,001 to $100,000,000 CG/commander of an LCMC or delegated responsible party. Coordination with the PM/PEO required. 41 AR 710–1 • 28 November 2016