AR-710-1 Army Inventory Management Download

Page 50 of 205

3–31. Supply functions at the depot for routine reclamation The supply directorate functions include working with DLA to— a. Ensure timely movement of major items or assemblies to and from the maintenance shop. b. Reclassify to condition code M end items transferred into the maintenance shop for reclamation. c. Account for by NSN those components consisting of separate identifiable item configurations. d. When the reclaimed assembly or component and PMRD number is received from the maintenance shop, input the receipt (DIC D6L) into the LMP to account for the materiel recovered through reclamation. e. Notify the depot RPCO of the receipt processing. f. Process the major item or assembly from which materiel was reclaimed per instructions from the LCMC. (1) If the basic configuration is still recognizable, disposal is under the NSN assigned to the original configuration and the appropriate condition code. (2) If the original configuration has lost its identity and an NSN cannot be assigned, reclassify the item to condition code S (scrap) for disposal. 3–32. Life Cycle Management Command functions for priority reclamation Use priority reclamation on receipt of a requisition requiring immediate action (not mission capable due to supply (NMCS), anticipated NMCS, or priority designator 01–08). Accomplish priority reclamation as follows: a. The assembly or component manager— (1) On receipt of a priority requisition, coordinates with the major item manager to determine if an assembly or component with an acceptable condition code is available from routine reclamation. If not, determines the priority reclamation repair lead time and the procurement lead time. If procurement is impractical or the lead time for priority reclamation or repair is less, coordinates with the major item manager to determine availability from priority reclama- tion and the highest condition code for the end item from which the required assembly or component may be removed. (2) Sets up in the LMP the due-ins to develop the supplementary address field (columns 45–50). (3) Prepares a draft priority reclamation message for the major item manager’s approval to begin priority reclama- tion. Furnishes a copy to the LCMC RPCO stating the highest condition code of the end item from which the assembly or component may be removed. Give complete instructions in the message, to include— (a) The message address of the appropriate major item manager. (b) The message address of the appropriate depot RPCO. (c) The noun, NSN, and condition code for the end item from which assets are to be reclaimed. (d) The noun, NSN, quantity to be removed, and the appropriate TM reference for the asset to be reclaimed. (e) The document number for the reclamation action. (f) The materiel release order transaction on which the reclaimed assets are to be shipped. (g) Disposition instructions for the end item residue. (h) The sending POC’s name and phone number. (4) Cancels approved priority reclamations by telephone when assets become available from another source. Follows up a telephone cancellation by message. If reclamation is underway or has occurred, process the reclaimed assets as a receipt to the accountable records. b. The major item manager— (1) When asked by the assembly or component manager, determines the end item availability for priority reclama- tion and the highest condition code of the end item from which the required assembly or component may be removed. (2) When a priority message initiating reclamation action has been received from the assembly or component manager, sends the priority message to the appropriate depot RPCO. Gives information copies to the LCMC RPCO, depot supply directorate, and depot maintenance directorate. c. The LCMC RPCO— (1) On receipt of a copy of the priority reclamation message, sets up and keeps a suspense file until a copy of DA Form 7420 is received from the depot RPCO. (2) Maintains visibility of the following: (a) High priority bulk reclamation PRON as it is drawn down through the normal maintenance reporting procedures. (b) Production and cost data provided by the priority reclamation confirmation message. This message will include the following: 1. The message address of the sender, usually the appropriate depot RPCO. 2. The message address of the appropriate LCMC RPCO. 3. Reference to the message requesting this priority reclamation. 36 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.