AR-710-1 Army Inventory Management Download
Page 49 of 205
MI Manager Assm. Manager Field Return Quality Assurance (QA) Supply Storage Depot DLADS Transport FTE & FTR LCMC RPCO Depot RPCO • Receive major item/system from Supply • Remove required parts and assemblies • Obtain QA inspection and forward materiel to supply Before reclamation: • Inspect, test and reclassify to correct condition code After reclamation: • Inspect, test and reclassify to correct condition code Before reclamation: • Receive major item/system from field • Forward DA Form 7421 and major item/system to Maintenance as planned. After reclamation: • Receive major item/system from QA with DA Form 7420 • Place in storage or ship to DLADS as directed by LCMC major item manager • Receive reclaimed materiel • Report receipt to LCMC and depot RPCO Before reclamation: • Direct major item/system to depot • Request Save List • Establish due-in(s) • Coordinate requirements with other managers • Send Save List & PMRDs to RPCO After reclamation: • Receive completion notice • Resolve discrepancies • Clear residual due-in • Issue assets or schedule reclaimed materiel for repair as required Before reclamation: • Request Save List • Forward Save List and PMRDs • Schedule reclamation • Follow-up as required After reclamation: • Receive notification of completion • Notify managers of completion • Resolve discrepancies Before reclamation: • Receive Save List and PMRD numbers. Forward to Maintenance • Create suspense file • Give status as requested • Plan with Supply, QA and Maintenance • Notify LCMC RPCO of schedule After reclamation: • Notify LCMC of completion • Resolve discrepancies KEY: Flow of information = Flow of hardware = Functional roles = FTE = Report of excess FTR = Reply to excess report Maintenance Figure 3–1. Overview of routine reclamation 35 AR 710–1 • 28 November 2016