AR-710-1 Army Inventory Management Download
Page 37 of 205
c. Commanders of DLA depots and AMC repair facilities process ARI receipts per AR 725–50. 3–9. Automatic return item objectives The objectives of the ARI program are to— a. Speed the return of recoverable secondary items and selected repair parts to the national/wholesale system. b. Maximize Army materiel readiness. c. Provide responsive and economical supply support. d. Avoid over-procurement and costly changes in depot maintenance programs. e. Ensure the return of ARIs, regardless of value. 3–10. Automated return item selection criteria a. The ARI program speeds the return of critical items (excluding ammunition). An item is selected as an ARI based on its availability and critical need to Army users. Table 3–2 contains ARI codes, selection criteria, and shipping procedures. b. The criteria for selecting items for the ARI program are as follows: (1) The recoverability code is D, L or K and the stock level is within authorized retention levels (approved acquisition objective, economic retention stock (ERS), and contingency retention stock (CRS). DLRs with stock levels above or expected to be above authorized retention levels may be on the ARIL if the only source of supply is repair. AR 725–50, chapter 7, governs excess or unserviceable DLRs not on the ARIL. (2) The recoverability code is other than D, L or K and a scheduled (funded) repair program exists. Do not return unserviceable items with recoverability code Z to the national/wholesale level. (3) Critical requirements exist for the item. (4) The item is special. Examples of special items are aircraft bearings and empty reusable shipping containers (para 3–24). (5) The AMC LCMC is the secondary inventory control activity (SICA) for NIMSC 5 items. Return NIMSC 5 unserviceable (condition codes E and F) items automatically using priority 03–06 with project code 3AL or blank (table 3–2). (6) See appendix D–2 for assignment of the consumable reparable indicator code. 3–11. Field maintenance level retention criteria for automated return items a. Serviceables. No ARIs are authorized for retention above the retail requisitioning objective per AR 710–2. Do not retain non-authorized stockage list (NSL) items. b. Unserviceable. Return items with recoverability code D, L or K when determined to be not reparable at this station, regardless of below-national asset position. ARI criteria apply if— (1) Items are beyond the capability of general support repair resources (for example, funds, skills, tools, and equipment). (2) Items exceed the authorized levels of maintenance in AR 700–82. c. Flight Safety Critical Aircraft Parts (FSCAP) should have a criticality code of “F” (“E” if nuclear hardened) items. Organizations turning in Army aviation items with one of the above listed criticality codes must request disposition instructions from the managing commodity command using the materiel returns program process. These items must have demilitarization (DEMIL) action performed prior to being offered for sale by the DLADS. 3–12. Automatic return procedures a. Ship serviceable ARIs to the nearest DDD. Ship unserviceable ARIs to the designated maintenance facility. b. The field/retail supply activity will return the item as directed by the ARIL. c. Sources of supply (such as, AMCOM, TACOM or Communications and Electronics Command (CECOM)) will program, budget, and fund for SDT costs of secondary items. d. Policy for OCONUS SDT for return of secondary items (second position of the materiel category code (MAT- CAT) is 2) is as follows: (1) The source of supply or LCMC will program, budget, and fund for over-ocean SDT, port handling and charges from the CONUS port to the distribution depot. The source of supply or LCMC will not finance OCONUS line-haul. (2) The OCONUS ACOM, ASCC and DRU will program, budget, and fund for SDT costs for OCONUS line-haul (that is, from installation to OCONUS port.) e. DCS, G–4 (DALO–FPT) will provide the following information at the beginning of each fiscal year to each CONUS and OCONUS ACOM, ASCC and DRU: (1) The appropriate fund site to be used for the CONUS portion of SDT. (2) The appropriate transportation account code for the over-ocean portion of the SDT. 23 AR 710–1 • 28 November 2016