AR-710-1 Army Inventory Management Download
Page 30 of 205
items without NSNs or permanent system control numbers assigned. Also, submit supplementary provisioning technical documentation when the item is not identified by a Government specification or standard that completely describes it (including the physical, material, dimensional, mechanical, electrical, and functional characteristics). When supplemen- tary provisioning technical documentation is not available, identify the item at least by commercial and governmental entity code and a definitive reference number, item name, and unit of issue to permit NSN assignment. Assignment of the technical data justification code in the request transaction indicates the reason documentation is not provided. (4) Special requirements are as follows: (a) When new items require control or quality assurance exceeding normal practices called for by the drawings and inspection specifications are submitted, include a complete statement of the specialized requirements with the technical documentation for the item. When IMM contracting officers decide against sole source procurement, they will coordinate that decision with the SICC before starting procurement. (b) When the unit of issue for a new item is non-definitive, the technical documentation will show the quantitative measure for the configuration. For example, if the unit is a tube and the tube contains 5 ounces, the technical documentation will show that the tube contains 5 ounces. If a non-definitive unit of issue is received without the required quantitative measure, the SSR is rejected with action taken code 70. (c) When the reference number submitted for a new item is non-definitive (reference number variation code 1), the technical documentation will provide descriptive information (as required by the ordering data section of the specifica- tion) for the IMM to assign an NSN. Do not change non-definitive reference numbers to identify the descriptive characteristics part of the reference number. (5) Note the contract number under which the technical documentation was procured, if appropriate, and the right to use (or any restrictions) on drawings and other documentation before submission (Defense Federal Acquisition Regulation Subpart 227.71). Also give the SICC and IMM activity codes, provisioning control code, item serial number, and date of request to speed filing and matching of technical documentation with SSR transactions. e. Control of SSRs. (1) SICCs and IMMs will use the same data elements for controlling SSR transactions, in order to detect or prevent duplicate SSR submissions. A SICC will not duplicate a provisioning control code-item serial number-date of request combination while the provisioning control code resides in any SSR files at the SICC. Required control elements are as follows: (a) DIC - columns 1–3. (b) Activity code to - columns 4–5. (c) Item serial number - columns 43–48. (d) Date of request - columns 49–52. (e) Provisioning control code - columns 57–59. (f) Activity code from - columns 67–68. (g) Essentiality code - column 55 (Army managers enter). (2) Objectives for completing each key event are in table 2–1. (3) SICC and IMM processing systems will allow external and internal functional follow-ups when processing actions are overdue. Generate and transmit external functional follow-ups within the timeframes in table 2–1. Internal functional follow-ups or notifications will require action to correct the error condition, provide the required advice, or take other action to process for any exceptional conditions. f. SSR processing instructions. Detailed instructions on processing SSRs are in DOD 4140.26–M, volume 6. Table 2–1 Supply support request timeframe objectives Supply support request (SSR) event Start Stop Objective (in days) Deliver SSR to IMM Date of Request (See note 1.) Date received by IMM. 15 Final advice, part numbered sup- ply request Date SSR received by IMM Date advice received by service item control center (SICC) 60 (See notes 2, 3, and 4.) Final advice, national stock num- bered SSR Date SSR received by IMM Date advice received by SICC 25 Offer Date SSR received by IMM Date offer received by SICC 30 SICC’s reply to offer Date offer (YL/YQ) received by IMM Date CX2 advice received 75 SICC’s follow-up to a part num- bered SSR Date of request Date follow-up generated 65 16 AR 710–1 • 28 November 2016