AR-710-1 Army Inventory Management Download
Page 29 of 205
(a) Equipment design changes. (b) Follow-on provisioning of the same equipment from the same contractor under a different contract. (c) Re-provisioning of the same equipment from a different contractor under a different contract. (d) Requirements for the same equipment from the same contractor under the same contract with equipment deliveries spread over 2 or more years. (e) Requirements for items not originally provisioned that are generated from requisition processing or requests for support from field activities. (f) Requirements for different equipment that uses the same parts. (4) The IMM will determine the range and quantity of items to be stocked in the national/wholesale supply system based on the forecast of field/retail and national/wholesale quantities and other information provided in the SSR. This determination will comply with chapter 4. The AAC will reflect the method of support. After assignment of the AAC, the IMM will determine the projected support date and requirements to meet the level of support needed for the SSR. Include the date of support in the acceptance sent to the SICC when the IMM date of support is different from the requested date of support. The IMM will acquire stock, if needed, to support the SSR requirement upon receipt of a funded requisition received with an acquisition lead time in advance of need. (5) Budgeting and funding involves both the SICC and the IMM. (a) The SICC will send funded requisitions to the IMM for field/retail quantities of items. The SICC will also budget for and procure field/retail quantities, if required, to support fielded equipment until the support date indicated in the accept advice transaction. (b) The IMM will budget and fund requirements for items that are stocked in the distribution system of the IMM. The IMM will procure field/retail quantities of centrally procured non-stocked items only on receipt of a funded requisition. b. Items not subject to SSRs. (1) Medical materiel (AR 10–64). (2) Clothing and textiles (AR 32–4). (3) Subsistence items (AR 30–22). (4) Fuels (AR 710–2, DA PAM 710–2–1, and DA PAM 710–2–2). (5) Ammunition. (6) Items used only by a foreign country. (7) Non-consumable items. (8) Nuclear ordnance items. c. Items subject to SSRs. Items subject to SSRs are consumable items subject to integrated materiel management, including— (1) Provisioning and non-provisioning items. (2) Items already managed by an IMM. (3) New items being assigned to an IMM for the first time. (4) Initial and follow on supply support requirements. (5) Items once used only by a foreign country but now needed by U.S. Forces. d. Supplementary provisioning technical documentation. (1) These are required for— (a) Technical identification of items for maintenance support considerations. (b) Preparation of item identification for assigning NSNs. (c) Review for item entry control. (d) Standardization. (e) Review for potential IS. (f) Assignment of IMC. (g) Preparation of allowance and issue lists. (h) Initial procurement from contractor, original manufacturer, or other identified source. (2) Order of precedence of supplementary provisioning technical documentation is as follows: (a) Government or recognized industry specifications or standards. (b) Engineering drawings at least equal to levels 3, 2, or 1. One or more document identifier code (DIC) CXG (additional reference number) transactions will accompany unapproved drawings submitted as supplementary provision- ing technical documentation to show all other known references. (c) Commercial catalogs or catalog descriptions. (d) Sketches or photographs with brief descriptions of dimensional, material, mechanical, electrical, or other descriptive characteristics. (e) DIC CXF (item name). (3) When available, submit supplementary provisioning technical documentation for all SSRs or offers involving 15 AR 710–1 • 28 November 2016