AR-710-1 Army Inventory Management Download
Page 28 of 205
d. The IMM will notify the requiring DOD components (sponsoring DOD component for FMS customers) of a planned LOT buy. The IMM will provide item usage by DOD component, any known application data, and a required response date for submitting LOT buy requirements. Base the response time for DOD components on the last order deadline given to the IMM by the manufacturer of the item. e. The end item manager will validate maintenance requirements or GFM requirements before submitting them to the IMM. f. Using DOD components will provide the IMM detailed data required for budget purposes and include justification for requirements. g. The IMM will control the issue of LOT buy stocks. However, issues to DOD components may not be restricted or rejected based on original user requirements. h. LOT procurements will consider FMS requirements as future defined sales cases or Cooperative Logistic Supply Support Arrangement (CLSSA) may not be possible due to the item’s DMSMS issues. i. LOT procurements will include sufficient material to be provided as GFM for repair and for piecework applica- tions in the procurement of additional systems, equipment, spare assemblies, and sub-assemblies. 2–15. Assignment of the acquisition advice code The Acquisition Advice Code (AAC) is a DOD standard one-position alphabetic code that tells the customer how an item is acquired and identifies any restrictions on that acquisition. AR 708–1 covers the assignment of this code. DA PAM 708–2 provides a list of AACs in table 3–2. DOD standard definitions for each AAC are provided in DOD 4100. 39–M, volume 10 table 158. Section III Materiel Support Requests 2–16. Supply support requests A supply support request (SSR) is a document or group of documents requesting a consumable item of supply from an IMM. The SSR initiates user registration and obtains NSNs for new items of supply. Based on the SSR, the IMM must initiate action to record the submitting activity as a user of the item in the FLIS TIR at DLIS. a. Functions. (1) The Service Item Control Center (SICC) performs the three functions listed below. The SICC for DLA and GSA managed consumables are an exception, as they do not process SSRs. Each Army LCMC directly manages their SSRs and performs the function of the SICC personnel described in this section. In the context of SSR processing, the term “SICC” can be thought of as the “user or potential user Inventory Control Point (ICP).” (a) Before preparing SSRs, the SICC will correctly identify items of supply. Identifying information includes the commercial and governmental entity code, reference number, unit of issue, item name, and supplementary provisioning technical documentation. Screen the item via the LMP standard process utilizing pass-through screening. Review match conditionals to determine the correct NSN and IMM. (b) The SICC will justify the need for new NSNs by using the appropriate reference number justification code (see DOD 4100.39–M, vol 10, table 4) when probable or possible matches from the TIR are not technically acceptable. Justification is also needed when an item is source or quality controlled or when non-definitive reference number conditions apply. (c) The using SICCs may recommend that the IMM assign AAC J to items that have low predicted demands, that are known to be commercially available, and that are not required for system support of high-priority weapons, support systems, or equipment. Acceptance by an IMM (DLA or GSA) of the SICC requirement submitted by SSRs constitutes item management coding for such items. (2) The IMM performs two functions. (a) When the SSR is received, the IMM will perform item entry control using available resources (for example, the LMP pass through process, internal files, catalogs, and technical information from the SICC). When possible, use the result of item entry control to accept, offer a substitute for, or reroute the SSR to the correct IMM rather than returning it to the submitter for resubmission. If possible, reactivate or reinstate inactive and terminal items if a standard, replacement, or substitute item is not available. (b) The IMM will prepare Federal item identification descriptions for items new to the supply system using the technical information from the SICC, its own files, or from contractors. The IM will obtain NSNs and provide them to the SICC Record IMCs, to include user interest registration, and catalog management data in the TIR for all items. (3) The SICC will determine requirements for items coded for integrated materiel management and will generate funded requisitions with an acquisition lead time in advance to the IMM. The IMM will no longer honor SSRs for new items without funded requisitions. SSRs will be considered by the IMM for existing items already under their management. When acting as the executive Service during joint Service provisioning, the SICC will also include quantities needed to support participating Service requirements. Submit subsequent SSRs as initial or change transac- tions to cover— 14 AR 710–1 • 28 November 2016