AR-710-1 Army Inventory Management Download
Page 27 of 205
f. The COSDIF model. This model is also used to decide if an item will be kept or deleted from the national/ wholesale stockage list. The following criteria are used: (1) Delete items from the national/wholesale stockage list when their cost differential (cost of stocking minus cost of not stocking) is greater than $10. (2) Keep items on the national/wholesale stockage list if their cost differential is less than $10. (3) Screen items not qualifying for stockage against security assistance programs and maintenance overhaul require- ments. If no requirement exists and the item has been in the system for 3 years, change it to a non-stocked category. Process non-qualifying items with a demand frequency of three or more per year offline for review as numeric stockage objective (NSO) or insurance candidates. Apply non-stocked items against the economic retention model and contingency retention requirements, transfer them (see chap 2, sec IV), or dispose of them (see chap 3, sec VII). 2–12. Numeric stockage objective and insurance items NSO and insurance items are stocked and controlled at the national/wholesale level, regardless of COSDIF results. These items fall into one of the following categories: a. NSO–1 items include one-time or nonrecurring requirements. These items generally are assigned IMPC 1D, issue for depot requisitions only. Examples on NSO–1 items are as follows: (1) Modification kits. (2) Set assemblies. (3) High-cost items used only in maintenance overhaul programs. (4) LOT buys (see para 2–14). (5) Items that support low-density equipment. b. NSO–2 items are essential to accomplish a military mission, readiness-oriented, or required for personal safety or legal reasons that are not qualified for stockage under the COSDIF model. These items must be stocked, since non- availability would affect the readiness condition of essential weapon systems or end items. These items are assigned IMPC AE (mission essential item) and AA (insurance item). c. Insurance items are used on mission-essential or readiness-oriented systems or end items and facilities equipment. Maintenance engineers do not expect the item to fail (and assign source code PB). However, a few of these items must be stocked because if they did fail, their non-availability and long procurement lead times would significantly affect the readiness of the essential weapon systems or end items. 2–13. Diminishing manufacturing sources and materiel shortages Diminishing manufacturing sources and materiel shortages (DMSMS) is the loss or impending loss of manufacturing sources, or suppliers of items, or raw materials. DMSMS can occur at any point in the lifecycle of a weapon system. It occurs when the last known manufacturer ceases production of an item required to repair or build an Army system. Army policy on DMSMS is contained in AR 700–90, chapter 3. a. Each AMC LCMC will identify and act to reduce the impact on DOD acquisition and logistics support effectiveness when a system’s development, production, or post-production support capability is endangered by non- availability. Non-availability can include failure, safety alerts, improper calibration and DMSMS. b. AMC Research and Development Commands will designate a focal point to plan and coordinate Army actions to reduce the impact of DMSMS in accordance with DODI 5000.2. c. Each AMC LCMC will designate a point of contact (POC) that has responsibilities for DMSMS projects in accordance with AR 700–90, AMC PAM 5–23, and DODM 4140.01, volume 3. 2–14. Life-of-type buys A life-of-type (LOT) buy is one sustainment strategy for parts with DMSMS. A LOT buy is intended to be the last procurement ever made for the secondary item and to satisfy all future demands through the end of the item’s lifecycle. Consider and make LOT buys for secondary items required to support an end item when all other more economical alternatives to address materiel shortages or manufacturing phase-outs have been exhausted. a. IMMs should use the AMSAA LOT buy model to assist in calculating LOT buy quantities. POC for the model is the AMC, DCS, G–4. b. LOT buys must be approved in accordance with table 4–1. Assign IMPC 1F and source code PG to all secondary items with LOT buys. Contingency retention is authorized for items with LOT buys (para 4–4). (1) The IMM will fund the portion of the buy needed for initial spares after the DOD component support date and for replenishment stockage for the life of the end item. (2) The end item program manager (PM) will fund the portion of the buy that covers government-furnished material (GFM) for new production of end items and initial spares before the DOD component support date. The end item PM will pass the funded requirement to the IMM, who will include these requirements in the LOT buy. If no IMM is assigned, the end item PM will make the LOT buy. c. Identify LOT buy requirements for GFM used in support of new production equipment separately from require- ments to support maintenance. 13 AR 710–1 • 28 November 2016