AR-710-1 Army Inventory Management Download
Page 200 of 205
Reclamation The process of removing required serviceable and economically reparable components from potential DOD excess or surplus property, returning them to the proper supply activity, and processing the residue as directed. Recovery program control officer The designated individual at the LCMC and depot responsible for coordinating all phases of reclamation. Recovery program manager The designated DA representative responsible for development of policy and coordination of reclamation actions for DA. Recovery rate The ratio of actual or forecast reparable unserviceable items to total number of issued items that will eventually be returned to depot stock from a repair facility in a ready-to-use condition. The recovery rate will consider condemnation or washout rates expected during repair or rebuild. Repair To restore an item to a serviceable condition through correction of a specific failure or unserviceable condition. Repair administrative lead time The average time needed to process repair directives. Reparable Item An item of supply subject to economical repair and for which the repair (at either the sustainment/national or field level) is considered in satisfying computed requirements at any inventory level. Repair cycle float A quantity of selected Class VII equipment approved for stockage in the national/wholesale supply system to replace like items of equipment that are withdrawn from using activities for programmed depot maintenance. Repair lead time (called In house production time in LMP) The average time needed to restore an unserviceable item to serviceable condition. This lead time starts at the date of induction for repair and ends when the item has been inspected and reclassified as ready for use. Repair part Support items that are an integral part of the end item or weapon system. Reparable item An item of supply subject to economical repair and for which the repair (at either sustainment/national depot or field level) is considered in satisfying computed requirements at any inventory level. Reportable item control code A one-digit alphanumeric code assigned to those items of equipment for which asset reporting is required by AR 710–3 and AR 220–1. Requirement An established need justifying the timely allocation of resources to achieve a capability to accomplish approved military objectives, missions or tasks (TRADOC Regulation 71–20) Requirement rate A theater combat planning factor used by the DA Staff and ACOM, ASCC, and DRU commanders to determine ammunition and major item requirements for a specific timeframe. The requirements rate is used to determine optimal POM funding profiles and for staff planning for distribution and industrial preparedness actions. Requirements determination The computing of a new requirement forecast and comparing that forecast with the latest asset information. The purpose of the computation is to determine required management action to ensure responsive supply support of secondary items. 186 AR 710–1 • 28 November 2016