AR-710-1 Army Inventory Management Download
Page 195 of 205
Left Behind Equipment The materiel a unit leaves in garrison, state, home station, or unit storage location as it deploys to conduct missions for a Combatant Commander. A unit’s LBE remains linked to the parent UIC structure as part of their MTOE authoriza- tion, but is available for redistribution. ARNG LBE remains behind for use by the Governor of the deployed unit’s state in case of natural disaster or other defense support to civil authority situations. Life Cycle Management Command Subordinate commands within the AMC. The LCMCs interface with the network of Army PEOs, research and development centers, the DLA, Army maintenance depots and other organization to support the development, sustain- ment and phase-out of Army weapon systems. The largest LCMCs in AMC are TACOM, CECOM and AMCOM. The term LCMC is intended to encompass and expand upon the more limited materiel management functions (see below) traditionally performed by an Inventory Control Point . Life-of-type buys A purchase of an item designed to be the final purchase of that item and expected to last until the item is no longer needed in the supply system (for example, the only engine a piston is used on is being phased out of the system). LOT buys must consider support to MAP and FMS customers also. Line item number A number assigned to a generic nomenclature by Army technical committee action to identify the line on which the generic nomenclature is listed. Logistic control code One-character alpha code to Army-adopted items selected for inclusion in a type-authorization document which designates the level of logistics support and provides the basis for logistical support decisions such as procurement, overhaul, repair parts provisioning, and requisition determination. Logistics guidance Provides guidelines such as forces, time periods, consumption, use factors, and production capability to determine acquisition objectives and stock retention limits. The guidance sets an objective for acquisition of materiel related to the approved forces specified in the Five-Year Defense Program and for the retention of materiel related to these approved forces and to specified allied forces. Lot size An economic order quantity in LMP. The LOT size is similar to the “Reorder Cycle” in CCSS. Maintenance factor Indicates the number of expected failures that will require removal and replacement of the support item in a higher assembly per 100 end items per year. Factors are available for peacetime, wartime (at a sustained rate), environmental, and combat damage. Maintenance float A pool of end items from which temporary issues are made when a unit’s end item is sent to a maintenance shop for an extended period of time. It consists of operational readiness and repair cycle floats. Major End Item Final combination of end products, components, or materials that is of such importance to the operational readiness of the U.S. Army that its lifecycle responsibilities are managed by HQ, DA. It is separately type-classified, documented in the TOE, MTOE, TDA or Joint Table of Allowances (JTA), and identified in SB700–20, Chapters 2, 6 and 8. Major end item excess Quantity of equipment in the U.S. Army’s inventory that exceeds the AAO. Some portion of that quantity on hand above the AAO can be retained for specific purposes when approved under the authorities of this guidance. Potential uses include: authorized substitutes and ILO items, support for depot production requirements, historical monument requests, hard target (range) requirements, and foreign assistance programs. U.S. Army excess is screened for reuse within DOD before it is declared as an Excess Defense Article (EDA) by the DCS, G–3. Major item A final combination of end products, components, and/or materiel that is ready for its intended use. For purposes of the 181 AR 710–1 • 28 November 2016