i. Shelf Life Stocks: A number of items in sustainment stocks are direct vendor delivery, have shelf life require- ments and are DLA managed. With the introduction of direct vendor delivery managed stocks within DLA, global industrial base and use of the commercial transportation systems, it is now possible to reduce on-hand sustainment stock requirements for these items. For example, the tire and POL footprint can be reduced based on DLA’s ability to move stock into theater under the direct vendor delivery concept. j. General Supplies: Items defined with 00 in position 4 and 5 of the MATCAT code by FEDLOG will be identified and their requirements reduced if the source data is not provided by the Equipment Downtime Analyzer. Note. ASL and UBL requirements will be calculated at Battalion level. Exception: Separate Report Units not assigned to a Battalion will calculate requirements at a UIC level. C–5. War Reserve Secondary Item calculations a. Class I will be calculated based on DCS, Guidance (see DCS, G–4 and DLA Performance Based Agreement (PBA), Annex 9, Operational Rations dated 7 July 2009). AMSAA will be responsible for determining Class I requirements and pass information to TACOM for— (1) Vessel Sustainment (APS–3) - based on 45 days. (2) UBL (APS–3, APS–4 and APS–5) - based on 30 days. (3) Class I Requirements: Class I will remain on DLA stock record account and remain owned/managed by DLA until required by the Army. b. Clothing and chemical, biological, radiological, and nuclear requirements will be determined by AMSAA and TACOM–Philadelphia. Requirements will be determined utilizing AMSAA Model for: (1) Sustainment Stock will base on 60 days for APS 4 and 5 only. APS 3 with be base on 45 for sustainment requirements to be positioned on the vessels. (2) UBL- Same as 6b above. c. The United States Army Medical Materiel Agency (USAMMA) in coordination with OTSG will plan, program and budget for all materiel requirements in COSIS for the Class VIII portion of the APS program. Medical supplies will be calculated by USAMMA. Section III War Reserve Secondary Item Timelines C–6. War reserve secondary item milestones for review and validation of sustainment stock, authorized stockage list, shop stock and unit basic load stocks a. 30 Working Days: LOGSA and ASC provide detailed information for TPFDD/MTOE equipment density upon receipt of information from HQ AMC. Additionally, ASC will provide authorized and on-hand balances for sustain- ment, ASL, shop stock and UBL stocks to HQ AMC. b. 40 Working Days: RAND, AMSAA and LOGSA Expert ASL Review Team will generate appropriate require- ments based on information provided by HQ AMC. Provide consolidated, recommended requirements based on HQ AMC tasker. c. 30 Working Days: LCMCs will review consolidated list and conduct review process as specified in HQ AMC tasker. d. 30 Working Days: HQ AMC will review recommendations. e. 60 Working Days: ASCC will be provided a consolidated list and should recommend changes for sustainment stock recommendations (0–60). HQ AMC will conduct on-site review with HQ ASCC during this period as appropriate. f. 20 Working Days: HQ AMC will consolidate final recommended requirements. Send list to HQ AMC Chain of Command for review/approval. g. 10 Working Days: Upon receipt of approval from command, forward consolidated list to DCS, G–4 (DALO–ORC–PS) for final review and approval. h. 20 Working Days: Upon receipt of final list from DCS, G–4 (DALO–ORC–PS), RAND will establish a buy strategy for sustainment stocks only. i. 30 Working Days: HQ AMC posts final approved list to Army Knowledge On-Line (AKO) upon receipt of list from RAND. j. 90 Working Days: LCMCs post requirements, work disposition instruction for excess stock and start sourcing shortages/new requirements. All shortages and new requirements will be sourced 30 days prior to the end of FY. 129 AR 710–1 • 28 November 2016