AR-710-1 Army Inventory Management Download
Page 142 of 205
(1) An updated WRSI requirements process which supports initial and sustainment operations up to C+180 days in support of a given OPLAN. (2) Effective utilization of limited financial assets. (3) Sustainment, ASL, shop and UBL stockage recalculated and reviewed once every two years for land base sites. One APS WRSI requirement will be reviewed per year. Stockage for vessel-based operations will be scheduled for review the year ship is planned for download. APS–3 WRSI afloat requirements will be scheduled, reviewed and approved 8 months prior to vessels docking. Note. Contact HQ, AMC ((ATTN AMCOPS-CW), 4400 Martin Road, Redstone Arsenal, AL 35898-5000 for additional details on the Army WRSI Process). C–2. War Reserve Secondary Item shelf life and modernization plans a. LCMCs will work directly with ASC to collect data required to establish a shelf life rotation and replacement plan. The plan will be presented to HQ AMC WRSI PM by 1 September of each year. If shelf life rotation plan does not change from last submission, LCMC should notify HQ AMC by email that the plan has not changed. b. LCMCs will work directly with PMs for related WRSI to ensure these items are included for any modernization or upgrade requirements. LCMCs will provide HQ AMC WRSI PM a tentative schedule for upgrade or replacement of modernization plans (during the coming year) by 1 September each year. Section II War Reserve Secondary Item Computations C–3. War Reserve Secondary Item requirement models and concepts a. Use the AMSAA Optimum Stockage Requirements Analysis Program (OSRAP) and the RAND Peak Demand Model to calculate sustainment requirements for 0–180 days of supply as follows: (1) If the RAND and AMSAA lists match, then accept the list. (2) If the RAND and AMSAA NSNs match but requirement quantities vary, then accept the higher of the two. (3) For NSNs not on both the AMSAA and RAND lists, those directly related to a weapon system will undergo review by HQ AMC and the remaining NSNs will be removed from the list. b. Newly fielded equipment will utilize the initial parts fielding list or engineering requirements estimates until sufficient demand history is available. Weigh the two demand estimates (provisioning vs. historical) over a 2 year demand development period. At the end of this period, all requirements will be based on historical demands. C–4. War Reserve Secondary Item requirements determination data sources a. Time-Phased Force and Deployment Data (TPFDD): DCS, G–3/5/7 provides a list of units deploying in support of Combat Commander’s OPLAN. This information is provided to DCS, G–4 (DALO–ORC–PS) for review and passed to HQ AMC, APS Division. AMC provides this information to LOGSA and RAND. The TPFDD is broken down into 15–day increments depicting the arrival of units into theater. b. Personnel Density: This information is extracted from the TPFDD by LOGSA. Information is utilized to calculate troop support requirements. c. Equipment Density: Information is extracted from the TPFDD by LOGSA for deploying units down to UIC and NSN level. For active duty, ARNG and USAR the data source will be the current APSR. For a future unit MTOE, the data source will be the USAFMSA. d. APS Set Equipment Density: ASC, SICT will provide a list of equipment by UIC down to NSN level based on equipment on-hand and not authorizations. e. Define the tactical environment: Information specific to the fight should be defined during this phase to ensure calculations reflect the OPLAN for this theater. Information should be provided by DA based on an OPLAN. For example, Middle East operating environment allows for greater mobility than Pacific environment. Assumption: drive train and suspension system will require additional Class IX support in Middle East vs. Pacific. f. Define limiting facts for sustainment stock positioning: Site storage capability, condition of facilities and labor force available should be defined up front as it will impact sustainment stock in terms of amount and location of where stock can be stored. ASC should provide this data. For example, 55 gallon drums vs. 5 gallon or quart cans are of concern. For UBL and sustainment stocks, 55 gallon drums make no sense. The ability for troops in the field to transport, dispense and dispose of these items is limited in a field environment. Quart and 5 gallon containers can be stored on individual vehicles allowing for effective utilization of this asset. g. Define limiting facts for ASL and shop stock: Stocks must be totally mobile. Must be able to move everything during the first lift or it is sustainment stock. h. Expendable Sustainment Stocks: Items normally supplied by the General Service Administration (GSA) or DLA. For example, paper products, trash bags, garbage cans, etc. should be stocked based on the ability to procure these items within the theater of operation. Also consider the ability of above agencies to move stock into theater based on deployment timelines. 128 AR 710–1 • 28 November 2016