AR-710-1 Army Inventory Management Download
Page 140 of 205
a. Block 1, Report Number: locally generated sequence number. b. Block 2, Superseded Report Number: the DI requirements may change as the capability evolves through the milestones. Note the report number of the last submitted DA 5661 that refers to the prime LIN. c. Block 3, Date: enter the current date. d. Block 4,Basis of Issue Plan (BOIP) Number: enter the most Current BOIP, if one exists; enter NYA (not yet available) and notify supporting command when one is received. e. Block 5, To Command: enter the supporting PEO/PM (name, address, UIC). f. Block 6, From Command: enter the requesting PEO/PM (name, address, UIC). g. Block 7, Command Nomenclature: enter the nomenclature of the supporting commands requested capability. h. Block 8, NSN, enter the NSN of the supporting command’s capability. i. Block 9, Logistics Control Code (LCC), enter the LCC of the supporting command’s capability. j. Block 10, Line Item Number (LIN): enter the LIN of the supporting command’s capability. k. Block 11, Standard Study Number: enter the SSN of the supporting command’s capability. l. Block 12, Not Separate Authorization: place an “X” in the block if the requested support item is CMI. m. Block 13, Separately Authorized: place an “X” in the block if the requested support item is ASIOE. n.Block 14, Requiring Command Nomenclature: enter the nomenclature of the requesting command’s requested capability. n. Block 15, NSN: enter NSN of the requesting command’s capability. o. Block 16, LCC: enter the LCC of the requesting command’s capability. p. Block 17, LIN: enter the LIN of the requesting command’s capability. q. Block 18, SSN: enter the SSN of the requesting command’s capability. r. Block 19, Ratio: enter the ratio of the ASIOE/CMI item to the prime (4:1 means 4 ASIOE for every 1 prime; 1:4 means 1 ASIOE item to every 4 prime). s. Block 20, Highest System Nomenclature: if the prime LIN is subordinate to a higher system, enter the highest systems nomenclature. t. Block 21, Requiring Command point of contact (POC)/Preparer: enter the POC or form preparer information for the requesting command (name, address, phone number, email address). u. Block 22. In this block place the System Synchronization Officer (SSO) or other POC for the requesting PEO/PM (name, address, phone number, email address). The commander will sign, verifying the data on the completed form, is complete and accurate. Electronic entry of this form, or acceptable substitute, constitutes signature. v. Block 23, Procurement Lead-time: enter the quantity of the DI requested in the initial column for initial request; or in the reorder column if a follow on order to the initial request. w. Block 24, Command POC/Item Manager: enter the POC (preparer information for the supporting command (name, address, phone number, email address). x. Block 25, Command Approval: This form will be signed by the supporting command after adjudication with the supporting command’s SSOs and Lead Materiel Integrators (LMIs), and before returning with justification letter (if applicable) to requesting command. Electronic entry of this form, or acceptable substitute, will constitute signature. y. Block 26, Command POC/Reviewer: The supporting command enters the POC information for the SSO (name, address, phone number, email address). The SSO will initial in this block before returning form to the PEO/PM. The SSO’s initials signify the form was received and processed. z. Block 27, the supporting command enters the POC information for the LMI (name, address, phone number, email address). The LMI will initial in this block before returning form to the PEO/PM. The LMI’s initials signify the form was received and processed. B–3. Instructions for completing pages 2 and 3 of DA Form 5661 a. Header information is transferred from page 1 (blocks 1 and 10). b. The requiring command will complete the “quantity required” by month and FY, as appropriate, to indicate when the component or separately authorized items are required. Seven fiscal years are provided: current, budget, and five POM out-years. These years may be used to reflect expanded planning period (EPP) years. c. The supporting command will complete the “delivery schedule” column to indicate quantity, by month and by FY, of their forecast of availability. d. The supporting and requiring commands must provide information in the remarks block of section B. Remarks are not limited to the space provided, and can be continued on page 3 of the DA Form 5661. These remarks must include at least the following: (1) Whether assets are available from funded procurement program, current inventory and/or reasons for not being able to meet program delivery schedule requests. (2) If requiring command will provide funds to procure support equipment requirements. (3) If a new system or assemblage is displacing a current fielded system, and identify the displaced system. 126 AR 710–1 • 28 November 2016