AR-710-1 Army Inventory Management Download

Page 134 of 205

are excess and have no known future requirements. DCS, G–4 will compile/consolidate the excess declaration list and coordinate with DCS, G–8 for inclusion on the working divestiture list. (4) Once a MEI is declared excess, the DCS, G–8 SSO/AMC IM, in coordination with the PEO/PM, will evaluate where the excess MEI is in its lifecycle. This will drive the disposition plan and the storage requirement, if any, for the MEI. 15–16. Determining and tracking disposition of excess a. AMC in coordination with DCS, G–3/5/7, DCS, G–4, and DCS, G–8 will conduct planning for individual LIN/ NIINs to determine the best method of divestiture. A CBA must be conducted and provided to the DWG and the AERC in order to identify the best decision in support of the recommendation for divestiture should the decision be to retain any excess in storage and/or transport the end item(s) to another location. In conducting the BCA, long term storage costs, SDT charges and potential DEMIL costs are only a few of the factors that must be taken into consideration in determining the best disposition decision for a given end item. b. For DCS, G–8 managed LINs, DCS, G–8 will provide direction to AMC on the intended disposition for their excess MEI. If storage is required, AMC will determine the appropriate storage location. A BCA must be conducted and provided to the DWG and the AERC in order to identify the best decision in support of the recommendation for divestiture should the decision be to retain any excess in storage and/or transport the end item(s) to another location. c. For DCS, G–4/AMC managed LINs, AMC will coordinate with DCS, G–4 as required, to obtain guidance on the disposition plan for their excess MEI. If storage is required, AMC will determine the appropriate storage location. A CBA must be conducted and provided to the DWG to identify the best decision in support of the recommendation for divestiture should the decision be to retain any excess in storage and/or transport the end item(s) to another location. d. The PEO/PM, in coordination with the LCMC, will determine and submit the following funding requirements as part of the WSR and DWG process. (1) Cost to store and transport excess MEIs that are approved for retention. (2) DEMIL and disposal costs for these MEIs. e. Ownership/purpose codes will be processed and tracked in accordance with the provisions outlined in AR 725–50. f. The LCMC, with support from the PEO/PM, will attempt to mitigate long-term storage costs wherever possible. Storage location consideration should represent a “best value” approach for the Army as determined by the DCS, G–8 SSO’s intended disposition. Given that storage at SIAD incurs little to no storage costs to the Army, the LCMC and PEO/PM will conduct a BCA to consider sending MEIs with long-term storage requirements to SIAD to the maximum extent feasible. Likewise, when considering the relocation of a MEI from its current storage location to an alternative storage location, the LCMC and PEO/PM should be mindful that this will create a SDT bill, which may exceed the cost to continue storing the MEI at its current location, and therefore not represent a “best value” approach. g. Excess MEIs will be stored and accounted for in accordance with the provisions outlined in AR 740–26. Storage activities that have physical custody of materiel are responsible for its care, security, protection from the elements and environmental conditions, and for the execution of the COSIS program. h. Routine and Systematic Excess Evaluation. (1) Using the required BCA, the semi-annual DWG and the AERWG will serve as venues to evaluate the need for continued retention or disposal of excess, obsolete, or low use/low utility MEIs. (2) The DCS, G–8 SSO and AMC will have the opportunity to justify why the Army should retain excess or low use/low utility LINs. The DCS, G–8 will serve as the approval authority for the retention of DCS, G–8 managed LINs. The DCS, G–4 will serve as the approval authority for the retention of DCS, G–4/AMC managed LINs. (3) For DCS, G–8 managed LINs that exceed the AAO and are approved for continued retention, the DCS, G–8 SSO will provide their recommended disposition, and if required, the LCMC will determine the appropriate storage location. AMC will do the same for DCS, G–4/AMC managed LINs. A BCA must be conducted to identify the best decision in support of the recommendation for divestiture should the decision be to retain any excess in storage and/or transport the end item(s) to another location. (4) For MEIs that exceed the AAO and are disapproved for continued retention, the LCMC will make every effort to find a non-Army customer that requires the MEI prior to processing it through DLADS for DEMIL and disposal. 120 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.