AR-710-1 Army Inventory Management Download
Page 128 of 205
ASA (FM&C), DCS, G–3/5/7, AMC, ARNG, and USAR. The LIN Management Working Group reviews all manage- ment issues related to LINs on the DA LIN List, such as requirements, inventory, and POM procurement levels. j. Long Range Investments Requirements Analysis: A process where the Army looks out 30 years beyond the POM at the equipping and sustaining needs of the Programs of Record. This longer-term approach covers the entire acquisition lifecycle, to include sustainment. With the renewed emphasis on assessing the impacts of near-term investment decisions on the lifecycle costs and desired capabilities of Programs of Record, it is increasingly important to have a sustainment strategy that is synchronized with the modernization strategy. k. Organizational Requirements Document Approval Brief (ORDAB): A synchronization board co-chaired by USAFMSA and the DCS, G–8 with attendance from ASA (ALT); DCS, G–3/5/7; DCS, G–4; DCS, G–6; USAR; USASOC; TRADOC; and various Centers of Excellence. The ORDAB makes decisions on BOIPs and works to streamline the BOIP process and modernization. l. Retrograde, Reset, Redeployment, Redistribution (R4D): A mission that requires integration, innovation and creativity to meet the national objective of retrograding equipment back to the SDDC, the ASCC to U.S. Transportation Command, is overall responsible for ensuring success of the R4D movement mission. m. Weapon Systems Review (WSR): Colonel/GS–15 level forum for presenting lifecycle weapon systems and equipment funding requirements for cross-program evaluation group review and integration. The WSR provides the PEO/PM, with support from the AMC LCMC, the opportunity to present their current and emerging requirements to the program evaluation group. The WSR is chaired by the ASA (ALT); DCS, G–3/5/7; DCS, G–4; DCS, G–8; and AMC. Section II Duties 15–3. Assistant Secretary of the Army (Acquisition, Logistics and Technology) The ASA (AL&T) will— a. Participate in AERWG sessions that evaluate continued retention or disposal of excess, obsolete, and low use/low utility MEIs. b. As one of the WSR quad-chairs, facilitate the review of cost projections for excess MEIs (storage, SDT, DEMIL, and disposal costs) through the WSR process. c. In coordination with AMC, identify the funding requirements for the divestiture of excess, obsolete, and low use/ low utility materiel. If retained based on excessive DEMIL costs and /or future requirements, conduct a BCA. Excess materiel will not be relocated until the BCA is conducted and approved. d. Participate in the DWG, held semi-annually to identify and prioritize Army divestiture requirements. e. Provide support to the DCS, G–8 in determining the quantity of DCS, G–8 managed LINs that exceed the AAO. f. With DCS, G–8 and DCS, G–3/5/7 approval, and in coordination with the managing LCMCs, facilitate the disposition of excess, obsolete, and low use/low utility DCS, G–8 managed LINs. In cases where storage is required, but there is no direct supporting LCMC, the product support manager will determine the appropriate storage location and track the MEI to its storage destination. g. When required, support the DCS, G–8 to develop supporting rationale and justification for why the Army should retain excess or low use/low utility DCS, G–8 managed LINs. h. In coordination with AMC, submit the cost to continue to store and possibly transport excess MEIs approved for retention in accordance with this guidance. This is part of the WSR emerging requirements and will address BCA- identified “cost prohibitive” DEMIL and disposal costs as applicable. i. Support AMC by identifying methods to mitigate monthly end item storage costs wherever possible in support of the DCS, G–8 disposition plans. j. In coordination with DCS, G–3/5/7; DCS, G–4; DCS, G–8; and AMC identify divestiture candidate populations for FOS reviews. 15–4. Deputy Chief of Staff, G–3/5/7 The DCS, G–3/5/7 will— a. Develop, update and approve the AAO in AE2S with the support of the stakeholder community. The AAO (though the SACS) will serve as the start point for determining MEIs that are excess to Army requirements. b. Participate in the AERWG session that evaluates continued retention or disposal of excess, obsolete, and low use/ low utility MEIs. In support of the out-of-cycle excess determination process, provide an approve/disapprove decision on DCS, G–4/AMC and DCS, G–8 managed LINs. For the purposes of this guidance, out-of-cycle is defined as reporting excess MEIs outside of the 15–month cyclical divestiture process. c. Participate in the semi-annual DWGs to identify and prioritize Army Divestiture requirements. d. In coordination with the stakeholder community, identify and approve for retention select items above the AAO to be retained in the Army inventory. All items above the AAO without a valid requirement for future use will be considered excess. 114 AR 710–1 • 28 November 2016