AR-710-1 Army Inventory Management Download
Page 120 of 205
(3) Develop UDP recommendations and PSDs to optimize Army equipment on-hand readiness. In coordination with ASA (ALT), vet UDP new production and recapitalization distribution with PM offices. (4) Utilize LMI DST to develop recommended quarterly equipment sourcing solutions. (5) Coordinate execution of DODI 1225.06 replacement plans in accordance with DCS, G–8 guidance and request DCS, G–8 (DAPR–FDZ) coordinate approval for any plan changes. c. Request DCS, G–3/5/7 (DAMO–FMZ) adjudication of distribution and redistribution issues to include, but not limited to, inter-command materiel transfers between ACOMs, ASCCs and DRUs. d. Request DCS, G–8 (DAPR–FDZ) approval for any distributions that would require re-allocation from one component to another before finalizing plans. e. Report required delivery date slippage to impacted receiving commands and to AMC/LMI and DCS, G–8 (DAPR–FDZ). f. Support UERWGs, facilitate the PSD vetting process and support DCS, G–8 SRU analyses and briefs as required. g. Provide AMC with a collaborative linkage to Army PEOs and PM offices. 13–16. Army commands, Army service component commands, direct reporting units, Army National Guard, and United States Army Reserves The ACOMs, ASCCs, DRUs, ARNG and USAR will— a. Exercise authority for materiel distribution and redistribution against the following Army authorization documents. b. Serve as the entry point for their subordinate units regarding LMI distribution and redistribution mission and recommendations. c. In coordination with AMC/ASC (LMI), integrate use of the DST within commands/components to facilitate the equipment distribution and redistribution process d. Ensure equipment and components listed in the authorized column of the MTOE and TDA are on-hand or on- order. Also that equipment on-hand, to include items received from PMs and non-standard equipment, is properly and accurately accounted for within authoritative APSR and is aligned to MTOE or TDA requirements. e. Report to ASC excess major items in accordance with existing supply and materiel polices and process. f. Provided DCS, G–3/5/7 by-exception materiel demands (for example, an ONS request via ECOP) in accordance with DCS, G–3/5/7 ONS/ECOP procedures, the submitting units’ higher level commands are responsible for validating submitted ONS. Validation confirms an urgent need exists and that the need cannot be address by standard Army processes or through some other means such as cross leveling between units. g. Be responsible for equipment management in ECOP to include identification of sourcing solutions and comple- tion of ONS requirements when the materiel solution is delivered. Verify delivery of materiel solution to complete the ONS requirement in the ECOP. h. Link demands with supply in a networked environment (for example, DST) to forecast sourcing against future requirements with the intent of providing consistency, transparency and optimized solutions. i. Review and serve as approval authority for internally sourced UDPs (those sourced completely within the command through redistribution of its assets within authorized levels). j. Line Item Number distribution and redistribution issues, to include but not limited to inter-command materiel transfers between ACOMs, ASCCs, and DRUs, will be resolved at the lowest level possible. If resolution cannot be achieved at the lower levels, request DA level forums such as the AR2B, AERWG Integrated Process Team or special forums to adjudicate the issue. k. In coordination with AMC/ASC (LMI), schedule UERS as required; participate in the PSD vetting process; support TPF to include actions required to manage displaced materiel. l. Army National Guard (ARNG). The Director, ARNG has appointed the ARNG G–4 to serve as the LMI for the ARNG and will continuously collaborate with AMC/ASC and DCS, G–8. The ARNG will— (1) Advise AMC/ASC on ARNG-specific materiel distribution/redistribution issues. (2) Remain the approval authority for ARNG units’ excess equipment. (3) Conduct LIN distribution planning in AE2S. Once required capabilities are resident in DST and System Integrators are fully trained on DST, conduct LIN distribution planning in DST. (4) Execute specified responsibilities in accordance with the DCS, G–8 Policy and Procedures for Allocation Planning document. m. The CG, United States Army Reserve Command has appointed the USARC G–4 to serve as the LMI for the USAR and will continuously collaborate with AMC/ASC and DCS, G–8. The USAR will— (1) Advise AMC/ASC on USAR-specific materiel distribution/redistribution issues. (2) Conduct LIN distribution planning in AE2S. Once required capabilities are resident in DST and System Integrators are fully trained on DST, conduct LIN distribution planning in DST. (3) Execute specified responsibilities, in accordance with the DCS, G–8 Policy and Procedures for Allocation Planning document. 106 AR 710–1 • 28 November 2016