AR-710-1 Army Inventory Management Download

Page 118 of 205

13–12. Deputy Chief of Staff, G–3/5/7 The DCS, G–3/5/7 (DAMO–FMZ) will— a. Provide DCS, G–8, AMC and ASC access to all authoritative automated requirements. b. Prioritize units’ materiel requirements through the IRPL and DARPL. c. Serve as approval authority for Army Preposition Stocks strategy, structure and equipment releases in accordance with IRPL and DARPL priorities. d. Provide ASC with a real-time, unclassified data feed of all validated known Army materiel requirements (MTOE, TDA, ONS, JUON, Joint Emerging Operational Need, MEEL, ETDA, AUG TDA, operational projects) for the upcoming 36 months; provide periodic updates on the status of completing this task to the Army’s equipping community at the Army Equipping and Reuse Working Group. Ensure all materiel requirements modified by percent- age-based fill rates (for example, Aim Points) and all activities (units, APS plans, programs, operational projects) are prioritized in order of need from highest to lowest. e. As required and in coordination with DCS, G–8 ensure LOAs are provided to AMC/ASC Materiel Integrators (MI) to support any required allocations and/or distributions for equipment where BOIPs have not been applied. The DCS, G–3/5/7 (DAMO–CI) will— f. Approve materiel demands (requirements). g. Adjudicate, as AR2B chair, final ONS sourcing solution(s) for approval / disapproval and verify delivery of approved materiel solution(s) to complete the ONS requirement in ECOP. 13–13. Deputy Chief of Staff, G–4 The DCS, G–4 (DALO–SUE) will— a. Manage the SDT Management Decision Package (MDEP) and coordinate the synchronization of SDT funding and distribution plans. b. Program national sustainment operations for major item equipment transferred from PM offices to AMC. c. Program for development and procurement of Logistics Management Information Systems. d. Participate in DCS, G–3/5/7-led inter-theater equipment issue adjudication process as required. e. Review inter-theater UDPs for SDT charges. f. Review for approval APS loan requests with less than 6 month time horizons. g. Support and participate in UERWGs. h. Assist DCS, G–8 and AMC in adjudicating distribution and redistribution issues. LIN distribution and redistribu- tion issues will be resolved at the lowest level possible. If resolution cannot be achieved at the lower levels, DA level forums such as the AR2B, AERWG Integrated Process Team or special forums will adjudicate the issue. 13–14. Army Materiel Command The CG, AMC will— a. As the Army’s LMI, manage and synchronize materiel distribution and redistribution planning and execution for all Army equipment to and across ACOMs, ASCCs, DRUs, and Components in accordance with Army priorities, DOD and Army policy, Army authorization and prioritization documents, appropriate statutes, and authoritative inputs (for example, DCS, G–8 allocations and directed authorizations). b. Advise Senior Army Leadership about Army-wide materiel issues and materiel readiness. Respond to requests for information (RFIs) about equipment distribution and/or redistribution from senior leaders, Congress, and others, as required/tasked. c. Act as the proponent for the Lead Materiel Integrator Decision Support Tool (LMI DST). Link equipment demands with supply in DST to forecast sourcing against future requirements with the intent of providing consistency, transparency, and optimized solutions. Collaborate with HQDA, ASA (ALT), ACOMs, ASCCs, DRUs, and Compo- nents on DST capability refinement, training and sustainment. d. Combine stakeholder processes and inputs to produce an integrated materiel sourcing recommendation to meet all Army materiel requirements. Develop UDP recommendations and PSDs to optimize Army equipment-on-hand readi- ness. Facilitate the PSD vetting process with stakeholders as required. e. Provide collaborated (such as, with DCS, G–8 System Synchronization Officers (SSO), PM, and commands/ component) equipment distribution plans (proposed sourcing decisions) a minimum of nine months out to ACOMs/ ASCCs/DRUs and components on a quarterly basis. Additional equipment distribution plans may be necessary for ARFORGEN rotational units, in accordance with their ARFORGEN cycle. The goal is to synchronize distribution with MTOE development as part of the Command Plan process. f. In coordination with materiel stakeholders, verify requirements with equipment-on-hand and anticipated new and depot production materiel to identify excess and verify equipment shortages. g. In coordination with DCS, G–4 and DCS, G–8, ensure that AE2S and DST are complimentary and mutually supporting. Establish and periodically review memorandum of agreements and system interface agreements to facilitate data sharing between LIW and other authoritative automated systems. The Standard Study Number-Line Item Number 104 AR 710–1 • 28 November 2016

Need the part, or the data? Here is what NSN Lookup can do.

NSN Lookup is the catalog, the marketplace and the data feed in one place. Buy the part, sell your stock, or put the data inside your own systems.

Prefer to talk? Call +1-321-414-2175 (UK Freephone, UK callers only: 0800 640 4261), email [email protected] or shop in-stock items at shop.nsnlookup.com.