AR-710-1 Army Inventory Management Download
Page 110 of 205
(3) Work with HQ, AMC LMI office (AMCLG–LM) to ensure distribution and redistribution of approved DI in time to satisfy delivery requirements for all non DCS, G–8 managed LINs (non procurement). (4) Provide decision (acceptance or rejections) to the PEOs/PMs by 15 Jan each year for November submissions, and within 20 days of receipt for interim submissions. If this timeframe cannot be met, notify the requiring command for approval of any required extension time. (5) Set up a primary/generating item relationship. (6) Prepare a DA Form 5662 for each support item of equipment identified by a DA Form 5661. (7) Program, budget, and provide the ASIOE supporting item. (8) Program, and provide the CMI supporting item. (9) When a DI rejection is received from the LMI, the requiring PEO/PM will determine if the capability can be provided by an Army managed CMI/ASIOE equivalent. If not, the requiring PEO/PM will locate alternative sources of supply outside of the DI process. The alternative must meet the form/fit/function requirements of type classification and materiel release in AR 700–142. d. DCS, G–8 (DAPR–FD) SSOs will— (1) Monitor application of BOIP PLINs across the POM to ensure application to the force does not exceed resourcing by FY. (2) Analyze the SACS file to determine if PLIN levels exceed authorized resources. (3) Annotate each DA Form 5661 as completed, canceled, and/or quantity changes, per appendix B, and return to the PEO/PM within 20 workdays from the date of receipt. (4) Provide a transmittal letter delineating DI requirements with funding or program problems. The command’s transmittal letter must fully document the problems and any actions taken to date. (5) Program and budget long lead-time component items for developmental systems under the full funding concept. (6) Provide DI requirements for ASIOE to allow supporting PEOs/PMs and AMC LCMCs time to program and budget for long lead-time items and for developmental systems to satisfy delivery requirements. (7) Work with the HQ, AMC LMI Office (AMCLG–LM) to ensure distribution and redistribution of approved DI in time to satisfy delivery requirements. e. HQ, AMC LMI Office (AMCLG–LM) will— (1) Annotate each DA Form 5661 as completed, canceled, and/or quantity changes, per appendix B. Return to the PEO/PM within 20 workdays from the date of receipt for items not fulfilled with new procurement. (2) Provide a transmittal letter delineating DI requirements with funding or program problems. The transmittal letter to the PEO/PM must fully document the problems and any actions taken to date. (3) Work with DCS, G–8 (DAPR–FD) SSO to ensure distribution and redistribution of approved DI in time to satisfy delivery requirements. (4) Assess quarterly aggregate report of all DI requirements to ensure that DI requirements have been cross-leveled vertically and horizontally across the Army. f. LOGSA (AMXLS–AL) will— (1) Add all CMI and ASIOE approved by DCS, G–3/5/7 to the SSN cross-reference file. (2) Update assigned automated databases with current DI policy (chap 11). (3) Produce the management reports for use by the requiring and supporting commands. Chapter 12 Major Item System Map 12–1. Major Item System Map overview a. The Major Item System Map (MISM) is an integrated systems management concept. AMC is responsible for all major item systems management and codes, including the MISM. b. The MISM is the Army’s weapons system view at LIN level. It is a derivative product created in the LIW by materiel developers with the BOIPFD process. MISM aggregates the CMI(s) and ASIOE(s) into a weapons system view. c. AR 71–32 prescribes policies and responsibilities for the development and documentation of Army personnel and equipment requirements and authorizations and associated force management activities, to include development of BOIPFD, MARC, BOIP, and related documents by the materiel, combat, doctrine, and training developers. d. The MISM enables the computation of the MARC Total Direct Productive Annual Maintenance Man-hours (DPAMMH) for a major item. The MISM is utilized in the Army Flow Model and the Army War Reserve Deployment System because MISM identifies the CMI that is not always readily visible in Army property accountability systems. The PLIN APAMMH roll-up includes CMI (but not ASIOE) requirements. 96 AR 710–1 • 28 November 2016