AR-710-1 Army Inventory Management Download
Page 109 of 205
(3) Supporting PEOs/PMs program and budget for all DI ASIOE items that they manage. (4) Record requirements well in advance to allow timely identification, programming, and budgeting within procure- ment lead-times to allow system, assemblage, or item initial operating capability dates to be met. DI forms are exchanged between requiring and supporting PEOs/PMs; who will provide to their supporting DCS, G–8 System Synchronization Officer (SSO) and HQ, AMC Lead Materiel Integrator (LMI) as required. b. Processing DA Form 5661. (1) The requiring command will submit DA Form 5661 DI information to the supporting command. (2) The supporting command will annotate the DA Form 5661 with the delivery schedule and return it to the requiring command within 20 workdays, with letter of justification that outlines changes or problems with program or schedule. (3) When classified data are entered, all forms are classified per existing procedures and regulations. Annotating the DA Form 5661 with the delivery schedule and UIC destination information does not, by itself, require restricted classification of the information. c. The supporting command will complete the a DA Form 5662 DI summary report for each support item of equipment identified by a DA Form 5661. This form must be prepared and available for use at weapon system reviews (WSRs), joint capability assessments (JCAs), and program reviews (PRs). Results of these and other procurement program reviews should be reflected in an update to the AAO of the impacted systems. 11–4. Data interchange responsibilities a. DCS, G–3/5/7 (DAMO–FM) will— (1) Approve variances in the DI process. (2) Along with appropriate Army Staff elements, resolve DI program issues and problems. (3) Document approved DI requirements. (4) Work with DCS, G–8 (DAPR–FD) to develop reports showing impact of application of Principal and ASIOE LINs to BOIPs across standard requirements codes prior to developing the SACS. b. PEOs/PMs introducing systems, assemblages or their replacement into the U.S. Army inventory will— (1) Prepare initial interchange of PA funded major item data as soon as identified through capabilities development documentation by providing program requirements to supporting PEOs/PMs using DA Form 5661 (or an approved automated version). (2) Validate DI submissions annually at the start of each fiscal year (1 October). (3) Ensure that DI information is kept current by providing interim submissions to supporting PEOs/PMs as needed (no less than quarterly) for major changes in requirements. Turn-around time for interim submissions should be no more than 20 days. (4) Ensure that all DIs are updated 30 days before WSRs, JCAs, PRs and other program reviews; also as other program changes become known. (5) Ensure that COMSEC DI is requested two years prior to the required delivery date (RDD) via the Communica- tions Security Logistics Activity (CSLA) Information Systems Security Program (ISSP). Application at https://issp. army.mil. For COMSEC DI instructions, contact ISSP Application Customer Support at [email protected]. (6) Ensure that DI items are consistent with the item coverage in the most recent CDD, CPD, BOIP or approved BOIPFD. (7) Coordinate and send to the supporting PEO/PM changes to the existing DI coverage. This includes, but is not limited to, changes in quantity, RDD, and UIC if known. (8) Ensure that early integrated logistics support (ILS) planning includes determining and setting up CMI and ASIOE requirements, including COMSEC ASIOE items. (9) Work with DCS, G–8 (DAPR–FD) SSO to program and budget long lead-time component items for develop- mental systems under the full funding concept. Furnish funds to procure the CMI to the DCS, G–8 SSO through the supporting command in time to satisfy delivery requirements. Furnish research, development, test, and evaluation (RDT&E) funds to the supporting PEO/PM if materiel is at pre-milestone C of the weapon system development process. (10) Provide DI requirements for ASIOE allowing supporting PEOs/PMs and time to program and budget long lead- time for developmental systems to satisfy delivery requirements. AMC LCMCs will also use this data to plan and budget for ASIOE in the sustainment phase of the item lifecycle. c. Each PEO/PM responsible for the lifecycle management of the support item will— (1) Review all manual or automated DA Form 5661 sent by the requiring PEO/PM and verify NSN, SSN, LIN, LCC and nomenclature. The supporting PEO/PM will provide the requiring PEO/PM with data on availability of stock or procurement of the supporting major item. (2) Forward DA Form 5661 to ODCS, G–8 (DAPR–FD) SSO to program and budget for long lead-time items and requirements. 95 AR 710–1 • 28 November 2016