AR-710-1 Army Inventory Management Download
Page 108 of 205
Figure 11–3. Chemical and Biological Protection System (CBPS) M8E1, PLIN Z01533, ASIOE LIN T93271 c. Un-programmed surges in the program for one PLIN may require reprioritizing existing resources that could impact the readiness of other major item programs relying on the same CMI and ASIOE. Therefore, the introduction of new requirements must be synchronized with the POM, Budget Estimate Submission (BES) and the Army Enterprise Equipping and Reuse Conference. Validation of ASIOE and CMI should be included in the Independent Logistics Assessment. d. All prime LIN ASIOE/CMI transactions must be completed via the DI process. Supporting PEOs/PMs must provide contract number, modifications, CLINs, and delivery schedule data to the requesting PEOs/PMs no later than 90 days after the DI transaction has been processed through the SSO or ASC LMI. The SSO or ASC LMI should provide delivery schedule updates caused by contractor slippages. e. A quantity of ASIOE needed to ensure successful operation will be estimated. Whenever possible this quantity (stated as a ratio) will support the prime LIN operation and be shown in a numeric format so that requirements can be aggregated. The quantity is expressed as a ratio to the BOIP prime LIN item (for example, ASIOE LIN:prime LIN). For example, if one multi-meter (ASIOE item) is required to support every ten radios (BOIPFD Prime LIN Item), the entry would be 1:10. If the quantity cannot be defined as a numeric ratio, the Capability Development Document (CDD) will show the ratio as a reference to capability considerations (for example, 1: organic transportation, or 1: generic transportation). The BOIP FD will be submitted to the Organizational Requirements Documents Approval Briefing (ORDAB) showing 1: considered. This will confirm that all integration modeling has been completed. The ORDAB package will include results of modeling that show if capability is additive or dedicated. Note. 1. HIMARS built on back of M1085, only HIMARS LIN on authorization document. HIMARS cannot perform mission without the donor LIN. Note. 2. CBPS rides on back of M1085. Both the PLIN and the ASIOE LIN on authorization document. All systems retain the capability of performing their function without each other. 11–3. Interchange of item data a. DA Form 5661 (app B) is submitted as soon as an item of equipment or major system is identified in an approved requirements document. The CDD and Capability Production Document (CPD) are the primary initial requirements documents. (1) DA Form 5661 information must be consistent with data on the most current requirements document (for example; CPD, CDD, and BOIP). (2) The following items are funded from the major system, assemblage, or item budget line of the requesting PEO/ PM: (a) Items which are not common to the Army’s inventory. (b) Items categorized as “peculiar” or “unique”. (c) All DI CMI. 94 AR 710–1 • 28 November 2016