Premium Information is available for this item - Upgrade for $1 a day
5220-00-204-1602
Thread Roll Snap Gage
5220002041602 002041602
A gage used for the dimensional control of a specified external thread. It consists of a C-type frame and gaging members (rolls). The gaging members may be set and locked t0 specified maximum and/or minimum limits within the given size range of the gage. View more Thread Roll Snap Gage
November 2023
5
Marketplace 5220-00-204-1602
Request a Quotation from participating marketplace vendors
Related Documents 5220-00-204-1602 1+ Documents (More...)
Restrictions 5220-00-204-1602
5220-00-204-1602 is a Thread Roll Snap Gage that does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application. Demilitarization of this item has been confirmed and is not currently subject to changes. This item is considered a low risk when released from the control of the Department of Defense. The item may still be subject to the requirements of the Export Administration Regulations (EAR) and the Code of Federal Regulations (CFR). This item is not suspected to be hazardous. This item does not contain a precious metal.
Management Data 5220-00-204-1602
- Effective Date
- Organization
- Unit of Issue
- Unit Price
- Qty Unit Pack
- Unit of Issue
- Jul 2012
- Department of the Air Force (DF)
- EA
- Subscribe
- 1
- EA
- MOE
- USC
- Code
- Statement
- Order of Use
- Jump To Code
- Qty Per Assy
- UOM
- Technical Document
- Quantative Expression
- Code
- Department of the Air Force (DF)
- L
- N
- Disposal
- N
Air Force
- Budget:
- Y
- Centrally procured equipment items. They are separate, primary end items (other than the weapon system itself) needed by a user to perform an assigned mission. They are non-expendable items (ERRC NF or ND) which are not consumed in use, and they do not lose their original identity during periods of use by incorporation into, or attachment to another assembly
- Price Validation Code:
- V
- The current standard price has been validated.
The item has been analyzed in conjunction with the Zero Overpricing Program and is in the accepted price range.
The item was procured under open competition and under the competitive arena the price is considered fair and reasonable.
ZOP or Standard price challenges are permissible but must be supported by adequate justification.
- Expendability
Recoverability
Repairability: - U
- Reparable. Condemn at Intermediate. AF Equipment Management System (AFEMS).