TM-9-2350-273-BD M60 M48 Battle Damage Assessment and Repair Download
Page 81 of 288
TM 9-2350-273-BD COOLING SYSTEM Procedural Steps (Cont'd) 5. Reinstall rear deck. 6. When both fan assemblies are defective, the vehicle must be recovered. 7. Record the BDAR action taken. When the mission is completed, as soon as practicable, repair tank using standard maintenance procedures. 5-4