TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 89 of 772
TM 9-2350-260-20-1-2 TRANSMISSION MOUNTS (LEFT AND RIGHT) REPLACEMENT (Sheet 4 of 4) 3. Using pliers, install lockwire (Item 59, Appendix D) (D) between bushing (C) and bracket (A). 4. Remove from vise and position bracket (A) onto transmission and, using 3/4 inch socket, install three screws (E) and new lockwashers (F) through mount on transmission into bracket (A). Leave screws loose. 5. Position spacer (G) into bracket (A) and install bolt (H) through spacer (G), mount (A), and washer (J). 6. With second person using 1-1/2 inch wrench to hold bolt (H), use 1-1/2 inch socket and torque wrench to tighten nut (K) to 380-415 lb-ft (515-562 N•m). 7. Position roller (L) onto screw (M) and install screw (M) through bracket (A). 8. Using bit screwdriver and 1/2 inch drive ratchet to hold screw (M), use 1-5/16 inch wrench to install new self-locking nut (N) into screw (M). NOTE It may be necessary to turn universal to gain access to screw (E). 9. Using torque wrench and 3/4 inch socket, tighten screws (E) to 70-75 lb-ft (95-102 N•m). 10. Install 2A powerplant (page 5-14) or 2D powerplant (page 5-40). End of Task TA147466 6-12