TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 86 of 772
TM 9-2350-260-20-1-2 TRANSMISSION MOUNTS (LEFT AND RIGHT) REPLACEMENT (Sheet 1 of 4) PROCEDURE INDEX PROCEDURE PAGE Removal 6-10 Cleaning and Inspection 6-11 Installation 6-11 TOOLS: 3-1/8 in. socket with 3/4 in. drive T-slide handle with 3/4 in. drive Diagonal cutting pliers 36 in. extension with 3/4 in. drive Slip joint pliers 1-1/2 in. open end wrench 1-1/2 in. socket with 3/4 in. drive Ratchet with 3/4 in. drive 3/4 in. socket with 1/2 in. drive Ratchet with 1/2 in. drive 1-5/16 in. open end wrench Bench vise Torque wrench with 3/4 in. drive (0-600 lb-ft) (0-813 N•m) Bit screwdriver with 1/2 in. drive Torque wrench with 1/2 in. drive (0-175 lb-ft) (0-237 N•m) Ball peen hammer SPECIAL TOOLS: Resilient mount mechanical puller (Item 34, Chapter 3, Section I) SUPPLIES: Dry cleaning solvent (Item 54, Appendix D) Lockwire (Item 59, Appendix D) Rags (Item 65, Appendix D) Lockwasher (MS35338-53) Lockwasher (MS35338-48) (3 required) Self-locking nut (MS51922-68) PERSONNEL: Two PRELIMINARY PROCEDURE: Remove powerplant (page 5-1) NOTE The procedure applies to both right and left transmission mounts. Go on to Sheet 2 6-9