TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 80 of 772
TM 9-2350-260-20-1-2 FRONT POWERPLANT GUIDE (LEFT AND RIGHT) REPLACEMENT (Sheet 1 of 1) TOOLS: 15/16 in. combination box and open end wrench 15/16 in. socket with 1/2 in. drive Ratchet with 1/2 in. drive Hinged handle with 1/2 in. drive Torque wrench with 1/2 in. drive (0-175 ft-lb) (0-237 N•m) SUPPLIES: Lockwasher (MS35338-50) (6 required PRELIMINARY PROCEDURE: Remove powerplant (page 5-1) REMOVAL: NOTE Three screws on right guide cannot be loosened or removed using socket. Use wrench to remove screws that cannot be removed using socket 1. Using socket with hinged handle, loosen screws (A). 2. Using socket or wrench, remove six screws and lockwashers (A). Throw lockwashers away. 3. Remove inner support (B) and front guide (C). INSTALLATION: 1. Mount inner support (B) and front guide (C). 2. Install six screws and new lockwashers (A). NOTE Three screws on right guide and two screws on left guide cannot be torqued. Use wrench to tighten screws that cannot be torqued. 3. Using socket with torque wrench, tighten screws (A) to 157-212 lb-ft (212-286 N•m). 4. Install 2A powerplant (page 5-14) or 2D powerplant (page 5-40). End of Task TA147458 6-3