TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 753 of 772
TM 9-2350-260-20-1-2 ENGINE COOLING FAN SHROUD REPLACEMENT (Sheet 1 of 8) PROCEDURE INDEX PROCEDURE PAGE Removal 9-52 Installation 9-55 TOOLS: Slip joint pliers 9/16 in. combination box and open end wrenches (2 required) 1/2 in. socket with 1/2 in. drive 3 in. extension with 1/2 in. drive Ratchet with 1/2 in. drive Thickness gage (feeler gage) 1-1/4 in. socket with 1/2 in. drive 1/2 in. combination box and open end wrench Torque wrench with 1/2 in. drive (0-175 b-ft) (0-237 Nm) SUPPLIES: Cotter pin Lockwasher (MS353348-46) (12 required) Self-locking nut (MS21044N6) (2 required) PRELIMINARY PROCEDURES: Remove powerplant (page 5-1) Remove engine shroud supports (page 9-4) Go on to Sheet 2 TA146897 9-51