TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 745 of 772

TM 9-2350-260-20-1-2 TRANSMISSION SHROUDS REPLACEMENT (Sheet 5 of 8) Right Intermediate Shroud Replacement 5. Install cable assembly (E) through intermediate shroud (A). 6. Route cable assembly (E) to generator (F). 7. Using spanner wrench, connect cable assembly (E) connector to generator (F) connector. 8. Install grommet (G) around cable assembly (E) and into intermediate shroud (A). 9. Install 2A powerplant (page 5-14) or 2D powerplant (page 5-40). End of Task TA146889 9-43