TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 732 of 772
TM 9-2350-260-20-1-2 TRANSMISSION SHROUD REPAIR (Sheet 5 of 6) ASSEMBLY: 1. Position insulation (A) on shroud (B). 2. Using 7/16 inch socket install retainer (C) to shroud with 25 screws (D), 21 washers (E), and 4 new key washers. Be sure to position 4 key washers properly and bend tabs with chisel and hammer. NOTE Both parts of turnlock fasteners must be pointing in same direction. 3. Using 3/4 inch socket and 3/4 inch wrench, install three turnlock fasteners (F) to both sides of shroud (B). Use new self-locking nuts. Go on to Sheet 6 TA146876 9-30