TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 715 of 772
TM 9-2350-260-20-1-2 TURBOCHARGER SHROUDS REPLACEMENT (Sheet 1 of 6) PROCEDURE INDEX PROCEDURE PAGE Inner Shroud Replacement 9-13 Outer Shroud Replacement 9-17 Upper Shroud Replacement 9-18 Inner Shroud Replacement PROCEDURE PAGE Removal 9-14 Installation 9-15 TOOLS: 11/16 in. combination box and open end wrench 1/2 in. combination box and open end wrench 1/2 in. socket with 1/2 in. drive 5 in. extension with 1/2 in. drive Ratchet with 1/2 in. drive SUPPLIES: Self-locking nut (MS21045-5) Grommet (MS35490-16) PRELIMINARY PROCEDURES: Remove powerplant (page 5-1) Remove rear engine shroud support (9-4) Remove transmission oil cooler lines (page 6-135 or 6-145). Go on to Sheet 2 TA146860 9-13