TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 705 of 772
TM 9-2350-260-20-1-2 ENGINE SHROUD REPLACEMENT (Sheet 2 of 2) INSTALLATION: 1. Position engine shroud (A) on engine. 2. Using socket, install 22 screws, washers, and new lockwashers (B) securing engine shroud (A) to engine. 3. Using socket and torque wrench, tighten 22 screws (C) to 20-30 b-ft (2741 N•m). 4. Install transmission shroud (page 9-23). 5. Install top deck (page 16-22). End of Task TA146850 9-3