TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 655 of 772

TM 9-2350-260-20-1-2 ACCELERATOR PEDAL RETURN SPRING ADJUSTMENT (Sheet 2 of 2) 5. Using wrench, loosen screw (C). 6. Using fingers, move clamp (D) slightly toward rear of tank. 7. Using wrench, tighten screw (C). 8. Repeat steps 1 and 2. If scale (A) still reads over 8 pounds, repeat steps 5 thru 7 until 8 pounds or less but more than 7 pounds are required to depress pedal. 9. Using wrench, loosen screw (C). 10. Using fingers, move clamp (D) slightly toward front of tank. 11. Using wrench, tighten screw (C). 12. Repeat steps 1 and 2. If scale (A) still reads less than 7 pounds, repeat steps 9 thru 11 until 7 pounds or more but not more than 8 pounds are required to depress pedal. 13. Connect accelerator linkage at powerplant (page 7-380, steps 32 and 33). End of Task TA148461 7-386