TM 9-2350-260-20-1-2 2A ENGINE AND 2D ENGINE POWERPLANT TESTS (GROUND HOP) (Sheet 3 of 16) TEST HOOK-UP: 1. Position powerplant dose to hull to permit connection of electrical cable assemblies and fuel hose assemblies. 2. Connect cable assemblies and hose assemblies to powerplant as shown. 3. Using spanner wrench, tighten cable assemblies. NOTE No two cable and hose connectors are the same. Match ground hop cable and hose connectors with engine cable and hose connectors for hookup procedures. Go on to Sheet 4 TA14794 5-54