TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 632 of 772

TM 9-2350-260-20-1-2 MANIFOLD HEATER INPUT SOLENOID VALVE AND FUEL LINE REPLACEMENT (Sheet 6 of 10) Input Solenoid Valve Replacement (Sheet 1 of 5) PROCEDURE INDEX PROCEDURE PAGE Removal 7-364 Installation 7-366 TOOLS: 7/16 in. combination box and open end wrench 1/2 in. combination box and open end wrench 5/8 in. combination box and open end wrench 5/16 in. combination box and open end wrench 9/16 in. combination box and open end wrench 3/8 in. combination box and open end wrench Flat-tip screwdriver SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I) SUPPLIES: Container to catch fuel leakage Rags (Item 65, Appendix D) Sealing compound (Item 28, Appendix D) Lockwasher (MS35338-43) (2 required) REFERENCE: TM 9-2350-260-10 PRELIMINARY PROCEDURE: Remove powerplant (page 5-1) Go on to Sheet 2 TA148438 7-363